NYC Building Report

Brooklyn Carroll Gardens-Cobble Hill-Gowanus-Red Hook

30 Centre Mall, Brooklyn

DOB violations

Department of Buildings violations attached to this BIN or tax lot.

280 records

Date Status Type Summary
Jan 3, 2017 V*-DOB VIOLATION - DISMISSED ACH1-(NYCHA) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED VIO ISSUED TO NYCHA ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST
Jan 3, 2017 V*-DOB VIOLATION - DISMISSED ACH1-(NYCHA) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED VIO ISSUED TO NYCHA ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST
Jan 3, 2017 V*-DOB VIOLATION - DISMISSED ACH1-(NYCHA) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED VIO ISSUED TO NYCHA ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST
Jan 3, 2017 V*-DOB VIOLATION - DISMISSED ACH1-(NYCHA) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED VIO ISSUED TO NYCHA ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST
Jan 3, 2017 V*-DOB VIOLATION - DISMISSED ACH1-(NYCHA) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED VIO ISSUED TO NYCHA ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST
Jun 1, 2016 V*-DOB VIOLATION - DISMISSED HVCAT5-NYCHA ELEVATOR PERIODIC INSPECTION/TEST ELEVATORREQUIRED FAILURE TO PERFORM CATEGORY 5 INSPECTION
Oct 1, 2015 V*-DOB VIOLATION - DISMISSED LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2014 INSPECTION REPORT
Oct 1, 2015 V*-DOB VIOLATION - DISMISSED LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2014 INSPECTION REPORT
Oct 1, 2015 V*-DOB VIOLATION - DISMISSED LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2014 INSPECTION REPORT
Oct 1, 2015 V*-DOB VIOLATION - DISMISSED LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2014 INSPECTION REPORT
Oct 1, 2015 V*-DOB VIOLATION - DISMISSED LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2014 INSPECTION REPORT
Oct 1, 2015 V*-DOB VIOLATION - DISMISSED LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2014 INSPECTION REPORT
Mar 3, 2015 V*-DOB VIOLATION - DISMISSED LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT
Mar 3, 2015 V*-DOB VIOLATION - DISMISSED LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT
Mar 3, 2015 V*-DOB VIOLATION - DISMISSED LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT
Mar 3, 2015 V*-DOB VIOLATION - DISMISSED LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT
Mar 3, 2015 V*-DOB VIOLATION - DISMISSED LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT
Mar 3, 2015 V*-DOB VIOLATION - DISMISSED LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT
Jul 28, 2014 V*-DOB VIOLATION - DISMISSED LL11/98-LOCAL LAW 11/98 - FACADE FACADE OPTIONAL CYCLE 7 UNSAFE REPORT FILED
Jul 23, 2014 V*-DOB VIOLATION - DISMISSED LL11/98-LOCAL LAW 11/98 - FACADE FACADE OPTIONAL CYCLE 7 UNSAFE REPORT FILED
May 15, 2014 V*-DOB VIOLATION - DISMISSED LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT
May 15, 2014 V*-DOB VIOLATION - DISMISSED LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT
May 15, 2014 V*-DOB VIOLATION - DISMISSED LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT
May 15, 2014 V*-DOB VIOLATION - DISMISSED LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT
May 15, 2014 V*-DOB VIOLATION - DISMISSED LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT
May 15, 2014 V*-DOB VIOLATION - DISMISSED LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT
Sep 20, 2013 V*-DOB VIOLATION - DISMISSED LL11/98-LOCAL LAW 11/98 - FACADE FACADE OPTIONAL CYCLE 7 UNSAFE REPORT FILED
Sep 20, 2013 V*-DOB VIOLATION - DISMISSED LL11/98-LOCAL LAW 11/98 - FACADE FACADE OPTIONAL CYCLE 7 UNSAFE REPORT FILED
Sep 20, 2013 V*-DOB VIOLATION - DISMISSED LL11/98-LOCAL LAW 11/98 - FACADE FACADE OPTIONAL CYCLE 7 UNSAFE REPORT FILED
Sep 20, 2013 V*-DOB VIOLATION - DISMISSED LL11/98-LOCAL LAW 11/98 - FACADE FACADE OPTIONAL CYCLE 7 UNSAFE REPORT FILED
Sep 17, 2013 V*-DOB VIOLATION - DISMISSED LL11/98-LOCAL LAW 11/98 - FACADE FACADE OPTIONAL CYCLE 7 UNSAFE REPORT FILED
Sep 16, 2013 V*-DOB VIOLATION - DISMISSED LL11/98-LOCAL LAW 11/98 - FACADE FACADE OPTIONAL CYCLE 7 UNSAFE REPORT FILED
Sep 16, 2013 V*-DOB VIOLATION - DISMISSED LL11/98-LOCAL LAW 11/98 - FACADE FACADE OPTIONAL CYCLE 7 UNSAFE REPORT FILED
Sep 16, 2013 V*-DOB VIOLATION - DISMISSED LL11/98-LOCAL LAW 11/98 - FACADE FACADE OPTIONAL CYCLE 7 UNSAFE REPORT FILED
Sep 16, 2013 V*-DOB VIOLATION - DISMISSED LL11/98-LOCAL LAW 11/98 - FACADE FACADE OPTIONAL CYCLE 7 UNSAFE REPORT FILED
Sep 16, 2013 V*-DOB VIOLATION - DISMISSED LL11/98-LOCAL LAW 11/98 - FACADE FACADE OPTIONAL CYCLE 7 UNSAFE REPORT FILED
Sep 16, 2013 V*-DOB VIOLATION - DISMISSED LL11/98-LOCAL LAW 11/98 - FACADE FACADE OPTIONAL CYCLE 7 UNSAFE REPORT FILED
Sep 16, 2013 V*-DOB VIOLATION - DISMISSED LL11/98-LOCAL LAW 11/98 - FACADE FACADE OPTIONAL CYCLE 7 UNSAFE REPORT FILED
Sep 16, 2013 V*-DOB VIOLATION - DISMISSED LL11/98-LOCAL LAW 11/98 - FACADE FACADE OPTIONAL CYCLE 7 UNSAFE REPORT FILED
Sep 16, 2013 V-DOB VIOLATION - ACTIVE LL11/98-LOCAL LAW 11/98 - FACADE FACADE OPTIONAL CYCLE 7 UNSAFE REPORT FILED
Sep 16, 2013 V*-DOB VIOLATION - DISMISSED LL11/98-LOCAL LAW 11/98 - FACADE FACADE OPTIONAL CYCLE 7 UNSAFE REPORT FILED
Aug 30, 2013 V*-DOB VIOLATION - DISMISSED FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED FAILED TO FILE FISP CYCLE 7B TECHNICAL REPORT BY 08/21/2012
Aug 30, 2013 V*-DOB VIOLATION - DISMISSED FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED FAILED TO FILE FISP CYCLE 7B TECHNICAL REPORT BY 08/21/2012
Aug 30, 2013 V*-DOB VIOLATION - DISMISSED FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED FAILED TO FILE FISP CYCLE 7B TECHNICAL REPORT BY 08/21/2012
Aug 30, 2013 V*-DOB VIOLATION - DISMISSED FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED FAILED TO FILE FISP CYCLE 7B TECHNICAL REPORT BY 08/21/2012
Aug 30, 2013 V*-DOB VIOLATION - DISMISSED FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED FAILED TO FILE FISP CYCLE 7B TECHNICAL REPORT BY 08/21/2012
Aug 30, 2013 V*-DOB VIOLATION - DISMISSED FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED FAILED TO FILE FISP CYCLE 7B TECHNICAL REPORT BY 08/21/2012
Aug 30, 2013 V*-DOB VIOLATION - DISMISSED FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED FAILED TO FILE FISP CYCLE 7B TECHNICAL REPORT BY 08/21/2012
Aug 30, 2013 V*-DOB VIOLATION - DISMISSED FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED FAILED TO FILE FISP CYCLE 7B TECHNICAL REPORT BY 08/21/2012
Aug 30, 2013 V*-DOB VIOLATION - DISMISSED FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED FAILED TO FILE FISP CYCLE 7B TECHNICAL REPORT BY 08/21/2012