Brooklyn Park Slope
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
4 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Dec 22, 2021 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Sep 27, 2021 | V*-DOB VIOLATION - DISMISSED | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | INSTALL APPROXIMATELY 35 LINEAR FEET OF SIDEWALK SHED ALONG THE 7TH ST SIDE OF BLDG.SIDEWALK SHED SHALL PROVIDE COVERAGE FOR THE ENTIRE ONE STORY PORTION OF BUILDING,& CONTINUE IN FRONT OFTHE FOUR STORY PORTION OF BUILDING TO PROVIDE PROTECTION FOR THE ENTRY DOOR DIRECTLY ADJACENT TO THE ONE STORY PORTION OF BUILDING |
| Feb 24, 2017 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT |
| May 4, 1998 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |