Brooklyn Coney Island-Sea Gate
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
5 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Jun 26, 2017 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | OCCUPIED 1 STRY GARAGE W/WOOD BOWSTRING TRUSS ROOF.REMEDY:W/60 DAYS OF DATE OF THIS VIO,OWNER IS TO ENGAGE A LIC NYS PE EXPERIENCED W/ROOF TRUSSES TO PROBE&EVAL STRL SOUNDNESS OF BOWSTRING USING FIELD VERIFIC, CALC,PROBES,ETC&SUBMIT A REPORT THAT IS ACCEPTABLE TO THE DEPT.REPAIR DWGS BE FILED W/DOB W/45 DAYS AFTER INSPECTION |
| Sep 28, 2015 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | 1 STORY GARAGE W/A WOOD BOWSTRING TRUSS ROOF. REMEDY: W/IN 60 DAYS OF DATE OF VIO OWNER TO ENGAGE NYS LIC PE EXP'D W/WOOD TRUSSES TO PROBE & EVAL STRUCTUAL SOUNDNESS OF BOWSTRING USING FILED VERIFICATIONS CALCULATIONS PROBES ETC & SUBMIT A REPORT ACCPETABLE TO THE DEPT. RPR DWGS TO BE FILED W/THE DOB W/IN 45 DAYS AFTER THE INSPECTION |
| Sep 17, 2014 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO COMPLY WITH A COMMISSIONER'S ORDER. THE BUILDING IS A WARE- HOUSE-TYPE STRUCTURE WITH A WOOD BOWSTRING TRUSS/ROOF. THE DEPARTMENT SERVED YOU WITH A CURABLE COMMISSIONER'S ORDER (NOTICE OF VIOLATION) TO PRODUCE AN ENGINEER'S REPORT ON YOUR BUILDING. NO ENGINEER'S REPORT HAS BEEN RECEIVED |
| Jun 17, 2014 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | IS A 1 STORY GARAGE W/ A WOOD BOWSTRING TRUSS ROOF W/IN 60 DAYS OF VIOL, OWNER TO ENGAGE A NYS(LIC)PE EXP W/ WOOD TRUSS TO PROBE & EVAL STRUCTURE. EACH TRUSS & BEARING TO BE EVAL. ANY DEFICIENCES TO BE SHARED. REPAIR DRWGS TO BE FILED W/ THE DOB W/IN 45 DAYS AFTER THE INSPECTION |
| Apr 22, 1992 | VP-VIOLATION UNSERVED ECB-ACTIVE | P-PLUMBING NONE | P-PLUMBING NONE |