Brooklyn Coney Island-Sea Gate
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
5 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Jun 17, 2019 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | EMERG WORK:INTERIOR LOT SUFFERED FIRE DMG ON 6/17/19. ROOF JOIST HAD MODERATE FIRE CHAR DEPTH OF ROOF JOIST HAD HEAVY FIRE DMG WITH CRACK& PART DETACH FRAMG@RISK OF PART COLLAP ONTO 2FL.ROOF SHEATHING HAD VARIOUS OPENINGS&EXPOSED TO THE ELMNTS.OWNR IMMED ENGAGE NYSPE&CONTRCT INSTL TEMP ROOF SHOR AS REQ SHEATHING&MEMBRN.PROVID CONTIN SUPV OF WRK |
| Jun 17, 2019 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FTM:INT LOT SUFFERED FIRE DMG ON 6/17/19.APPROX FRNT 15FT OF ROOFFRAM HAD MODERATE FIRE CHAR.APPROX 8FT STRIP OF ROOF JOIST APPROX 20FT FROM FRNT EXP1 FACADE HAD HEAVY FIRE DMG W/CRACK&PART DETACH ROOF JOISTFRAM AT RISK OF PART COLLAP ONTO 2FL.OWN ENGAGE PE EVAL ENTIRE BLDG&PREPARE REPR PLANS.REPRS PERFORM UNDER PERMIT BY 7/15/19 & CMPL BY 9/20/19 |
| Jun 17, 2019 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | DUE TO FIRE |
| Nov 2, 2016 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Nov 2, 2016 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |