Brooklyn Brighton Beach
2822 Brighton 8 Street, Brooklyn
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
29 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Dec 22, 2025 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN BLDG IN A SAFE CONDITION.VERTICAL AND STEP CRACKS WERE OBSERVED AT EXPOSURE 1 ALONG BRIGHTON 8 ST.OWNR TO RTAIN NYSPE TO EVAL THE ENT BLDG INCLUDNG EXTERIOR WALLS&RPAIR UNDR PRMT.STRT WRK BY 11/2/26 & COMPLTE/SGN OFF BY 12/14/26 |
| Dec 22, 2025 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | EMERGENCY WORK ORDER.BUILDING DAMAGED BY FIRE ON 12/20/25 SOME OF ROOF FRAMING AT UNIT C1 SEVERELY DAMAGD AND ROOF OPEN.UNDER DIRCT&CONTINOUS SPRVSN OF PE IMMED: 1.CLEAR ALL DEBRIS FRM ALL PUBLC AREAS INCLUDNG HLLWYS,REAR&SIDE YRDS |
| Dec 22, 2025 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN BLDG IN A SAFE CONDITION.BLDG DMGD BY FIRE ON 12/20/25.MODERATE TO SEVERE FIRE DMG NOTED@UNIT C1:SOME OF ROOF FRAMNG &ROOF OPEN.WATER DMG TO CEILNG&INT FINISHES NOTED@OTHER LOC.OWNR TO RTAIN NYSPE TO EVAL THE ENT BLDG INCLDNG EXT WALLS&RPAIR UNDR PRMTS STRT WRK BY 2/2/25&CMPLT/SGN OFF BY 3/16/26 |
| Dec 22, 2025 | V*-DOB VIOLATION - DISMISSED | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | SEAL AND SECURE THE BUILDING. REMOVE ALL FIRE RELATED DEBRIS AND HOUSE HOLD ITEMS. CLEAR ALL EXIT PASSAGEWAYS SERVING THE FIRE ESCAPES FOR LINES 7, 8, AND 9. RESTORE ALL REQUIRED MEANS OF EGRESSS TO AN UNOBSTRUCTED AND SAFE CONDITION |
| Dec 21, 2025 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | DAMAGE TO BLDG FROM FIRE ON FL1-FL4, STRUCTURAL DAMAGE TO FRAME AND WA LLS OF BLDG, ROOF OPEN AND CAVING IN, SMOKE AND WATER DAMAGE IN BLDG @ APTS A1, A7, A8, A9, B1, B7, B8, B9, C1, C7, C8, C9 REMEDY: OWNER TO HIRE NYSPE TO SEND REPORT TO ERTINSPECTIONS@BUILDINGS .NYC.GOV W/IN 3 DAYS W/PHOTOS, PLANS, AND RECOMMENDED COMP. TIMEFRAME |
| Dec 21, 2025 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | STRUCTURE RENDERED NONCOMPLIANT DUE TO FIRE DAMAGE TO BLDG ON FL1-FL4, STRUCTURAL DAMAGE TO WOOD FRAME, WALL; ROOF OPEN TO ELEMENTS. VACATE A1, A7, A8, A9, B1, B7, B8, B9, C1, C7, C8, C9 REMEDY: REPAIR ALL AREAS DAMAGED BY FIRE |
| Dec 1, 2022 | V-DOB VIOLATION - ACTIVE | EGRADE-FAILURE TO POST ENERGY GRADE/SCORE NONE | FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3 |
| Dec 1, 2021 | V-DOB VIOLATION - ACTIVE | EGRADE-FAILURE TO POST ENERGY GRADE/SCORE NONE | FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3 |
| Dec 14, 2016 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Jan 1, 2009 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Jan 6, 2006 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Jan 31, 2005 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Mar 19, 2003 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Aug 12, 2002 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |
| Mar 26, 2002 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Feb 27, 2001 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Feb 7, 2000 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Mar 16, 1999 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| May 4, 1998 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Sep 16, 1997 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Sep 16, 1997 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Feb 10, 1997 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Aug 29, 1995 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Jun 1, 1994 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Jun 1, 1994 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Aug 16, 1993 | V-DOB VIOLATION - ACTIVE | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Aug 16, 1993 | V-DOB VIOLATION - ACTIVE | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Jun 1, 1993 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Jun 1, 1993 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |