Brooklyn Flatbush
HPD violations
Housing Maintenance Code violations are filed by tax lot (BBL 3-05230-0072), so they can include other buildings on the same lot.
216 records
| Date | Class | Status | Apartment | Summary |
|---|---|---|---|---|
| Aug 24, 2026 | C | VIOLATION CLOSED | Not available | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES AT FIRE DOOR AT PUBLIC HALL, 2nd STORY, SECTION ''WEST'' |
| Aug 24, 2026 | A | NOV SENT OUT | 3 A | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE WOOD CLOSET DOOR IN THE KITCHEN LOCATED AT APT 3 A, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''EAST'' |
| Aug 24, 2026 | A | NOV SENT OUT | 3 A | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS AND ALL CEILINGS IN THE ENTIRE APARTMENT LOCATED AT APT 3 A, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''EAST'' |
| Jul 18, 2026 | A | VIOLATION CLOSED | Not available | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING AND WEST WALL AT PUBLIC HALL, 4th STORY, SECTION AT EAST |
| Jul 18, 2026 | B | VIOLATION CLOSED | Not available | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT PLASTER AT CEILING AND WEST WALL AT PUBLIC HALL, 4th STORY, SECTION AT EAST |
| Jul 18, 2026 | B | VIOLATION CLOSED | Not available | § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER THE CEILING AT PUBLIC HALL, 4th STORY, SECTION AT EAST |
| Jul 18, 2026 | C | VIOLATION CLOSED | Not available | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT WINDOW AT SOUTH WALL AT BULKHEAD , 4th STORY |
| Jul 18, 2026 | A | VIOLATION CLOSED | Not available | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING, SOUTH WALL AND WEST WALL AT PUBLIC HALL, 4th STORY, SECTION AT EAST |
| Jul 18, 2026 | B | VIOLATION CLOSED | Not available | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT PLASTER AT CEILING, SOUTH WALL AND WEST WALL AT PUBLIC HALL, 4th STORY, SECTION AT EAST |
| Jul 18, 2026 | B | VIOLATION CLOSED | Not available | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT SOUTH AND WEST WALL, AND WINDOW RECESS AT SOUTH WALL AT PUBLIC HALL, 4th STORY, SECTION AT EAST |
| Jul 18, 2026 | B | VIOLATION CLOSED | Not available | § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER THE CEILING AT PUBLIC HALL, 4th STORY, SECTION AT EAST |
| Jul 18, 2026 | A | VIOLATION CLOSED | Not available | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING, SOUTH WALL AND WEST WALL AT PUBLIC HALL, 3rd STORY, SECTION AT EAST |
| Jul 18, 2026 | B | VIOLATION CLOSED | Not available | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT CEILING, SOUTH WALL AND WEST WALL AT PUBLIC HALL, 3rd STORY, SECTION AT EAST |
| Jul 18, 2026 | B | VIOLATION CLOSED | Not available | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING, SOUTH AND WEST WALL AT PUBLIC HALL, 3rd STORY, SECTION AT EAST |
| Jan 5, 2026 | C | VIOLATION DISMISSED | Not available | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES AT BUILDING ENTRANCE DOOR |
| Jan 5, 2026 | C | VIOLATION DISMISSED | Not available | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES AT FIRE DOOR AT PUBLIC HALL, 3rd STORY |
| Jan 5, 2026 | C | VIOLATION DISMISSED | Not available | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR LOCKED AT BASEMENT AT BOILER ROOM |
| Jan 5, 2026 | C | VIOLATION CLOSED | 3B | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES IN THE ENTRANCE LOCATED AT APT 3B, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''EAST'' |
| Jan 5, 2026 | B | VIOLATION DISMISSED | 3B | § 27-2045(B)(1)(A) HMC, § 12-01, § 12-03 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL SMOKE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH DEPARTMENT OF BUILDINGS RULES AND REGULATIONS MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 3B, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''EAST'' |
| Jan 5, 2026 | B | VIOLATION DISMISSED | 3B | § 27-2045(B)(1)(B) HMC, § 12-06, § 12-07, § 12-09 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 3B, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''EAST'' |
| Jan 5, 2026 | C | VIOLATION DISMISSED | 3B | § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 3B, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''EAST'' |
| Jan 5, 2026 | C | VIOLATION DISMISSED | 3B | § 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE ENTIRE APARTMENT LOCATED AT APT 3B, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''EAST'' |
| Dec 16, 2025 | C | VIOLATION DISMISSED | Not available | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR LOCKED AT BASEMENT AT BOILER ROOM |
| Dec 16, 2025 | C | VIOLATION DISMISSED | 3D | § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 3D, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH |
| Dec 16, 2025 | C | VIOLATION DISMISSED | 3D | § 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE ENTIRE APARTMENT LOCATED AT APT 3D, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH |
| Dec 6, 2025 | B | VIOLATION DISMISSED | 3C | § 27-2045(B)(1)(B) HMC, § 12-06, § 12-07, § 12-09 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES THAT IS DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 3C, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH |
| Dec 6, 2025 | B | VIOLATION DISMISSED | 3C | § 27-2045(B)(1)(A) HMC, § 12-01, § 12-03 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL SMOKE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH DEPARTMENT OF BUILDINGS RULES AND REGULATIONS THAT IS DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 3C, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH |
| Dec 6, 2025 | C | VIOLATION DISMISSED | 3C | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES IN THE ENTRANCE LOCATED AT APT 3C, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH |
| Dec 6, 2025 | C | VIOLATION DISMISSED | Not available | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM LOCKED DOOR TO BOILER ROOM AT CELLAR AT BOILER ROOM |
| Dec 6, 2025 | C | VIOLATION DISMISSED | 3C | § 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE ENTIRE APARTMENT LOCATED AT APT 3C, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH |
| Dec 5, 2025 | A | VIOLATION DISMISSED | 3D | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE BATHROOM , THE BATHROOM LOCATED AT APT 3D, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH |
| Dec 5, 2025 | B | VIOLATION DISMISSED | 3D | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING AND WEST WALL IN THE BATHROOM LOCATED AT APT 3D, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH |
| Dec 5, 2025 | B | VIOLATION DISMISSED | 3D | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT WEST WALL IN THE BATHROOM LOCATED AT APT 3D, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH |
| Dec 5, 2025 | B | VIOLATION DISMISSED | 3D | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE BATHROOM LOCATED AT APT 3D, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH |
| Dec 2, 2025 | C | NOV SENT OUT | 3D | § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF HOT WATER ABOVE 130 DEGREES F IN THE ENTIRE APARTMENT LOCATED AT APT 3D, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH |
| Oct 29, 2025 | C | VIOLATION DISMISSED | 1B | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 1B, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH |
| Oct 2, 2025 | B | VIOLATION DISMISSED | 3D | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE SPRING BALANCES AT LOWER SASH AT WINDOW AT NORTH WALL IN THE KITCHEN LOCATED AT APT 3D, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH |
| Oct 2, 2025 | B | VIOLATION DISMISSED | 3D | § 27-2005 ADM CODE PROPERLY SECURE THE LOOSE WOOD COUNTERTOP AT BASE CABINET AT NORTH WALL IN THE KITCHEN LOCATED AT APT 3D, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH |
| Sep 19, 2025 | B | VIOLATION DISMISSED | Not available | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE CORRODED METAL LANDING AND TREADS AT EXIT STAIR , BUILDING'S YARD AT SOUTH |
| Sep 19, 2025 | B | VIOLATION DISMISSED | Not available | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CRACKED CERAMIC FLOOR TILES AT PUBLIC HALL, 2nd STORY |
| Sep 19, 2025 | B | VIOLATION DISMISSED | Not available | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CRACKED CERAMIC FLOOR TILES AT PUBLIC HALL, 3rd STORY |
| Sep 19, 2025 | C | VIOLATION CLOSED | Not available | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES AT FIRE DOOR , EAST WALL , AT PUBLIC HALL, 1st STORY |
| Sep 19, 2025 | C | VIOLATION DISMISSED | Not available | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE CRACKED TEMPERED GLASS AT ENTRANCE DOOR TO BUILDING , AT PUBLIC HALL, 1st STORY |
| Sep 19, 2025 | B | VIOLATION DISMISSED | 3D | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE GROUTING AS BETWEEN THE JOINTS AT BATHTUB, AND CERAMIC FOOR TIKES , NORTH WALL, IN THE BATHROOM LOCATED AT APT 3D, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''WEST'' |
| Sep 19, 2025 | B | VIOLATION DISMISSED | 3D | § 27-2045(B)(1)(B) HMC, § 12-06, § 12-07, § 12-09 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES INOPERATIVE IN THE ENTIRE APARTMENT LOCATED AT APT 3D, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''WEST'' |
| Sep 19, 2025 | C | VIOLATION DISMISSED | 3D | § 27-2043.1 HMC INSTALL THE MISSING OR REPAIR/REPLACE THE DEFECTIVE WINDOW GUARD(S) IN ACCORDANCE WITH THE SPECIFICATIONS OF THE NEW YORK CITY HEALTH CODE SECTION 24 RCNY CHAPTER 12. WG TO INSTALL = 2, WG TO REPLACE = 0, WG TO REPAIR = 0 IN THE ENTIRE APARTMENT LOCATED AT APT 3D, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''WEST'' |
| Sep 19, 2025 | B | VIOLATION DISMISSED | 3D | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE KITCHEN LOCATED AT APT 3D, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''WEST'' |
| Sep 19, 2025 | B | VIOLATION DISMISSED | 3D | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE GASKET AT REFRIGERATOR DOOR IN THE KITCHEN LOCATED AT APT 3D, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''WEST'' |
| Oct 22, 2024 | C | VIOLATION DISMISSED | 3 A | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 3 A, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST |
| Oct 22, 2024 | B | VIOLATION DISMISSED | 3 A | § 27-2026 ADM CODE REMOVE ALL OBSTRUCTIONS AND REPAIR ALL DEFECTS IN AT TUB WASTELINE IN THE BATHROOM LOCATED AT APT 3 A, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST |