NYC Building Report

Brooklyn East Williamsburg

280 Scholes Street, Brooklyn

DOB violations

Department of Buildings violations attached to this BIN or tax lot.

6 records

Date Status Type Summary
Aug 15, 2018 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL FTM DUE TO VEHICLE IMPACT:2ST SEMI DETACH WOOD&STEEL FRM COMM BLDG ON COR. LOT BLDG DIV INTO 4 SPACES U/ONE BIN EXP1 NORTH LOAD BEARING EXT WALL@1ST PORT OF BLDG DMG BY VEH IMPACT ON 8/13/18 APPROX 15FT OF EXP1 WALL DMG APPROX 10FT LGTH OF EXP1 WALL PART COLLAP PROV RPRS U/PMT FILE PMT BY 12/26/18 OBT PMT&STRT WRK BY 4/23/19 S/O PMT BY 8/17/19
Aug 14, 2018 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL EMERG WRK.PREM IS 2 STRY SEMI ATTACH WOOD&STEEL FRAMED W/MASONRY EXT WALLS,COMM BLDG ON CORN LOT.BLDG DIVIDED INTO 4 SPACES UND 1 BIN.EXP1 NORTH WALL LOAD BEAR&DAMAGED AT 1STRY PORT OF BLDG BY VEHICLE IMPACT ON 8/13/18.REMEDY:SHORE ROOF FRAM W/6FT OF EXP1.SHORE&SEAL DAMAGE EXP1 WALL.FILE PERM W/2DAY OF WRK.WRK START NO LATER 8/14/18
Aug 13, 2018 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL DUE TO MOTOR VEHICLE IMPACTING BUILDING
Aug 13, 2018 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL EMERG WRK.PREM IS 2 STRY SEMI ATTACH WOOD&STEEL FRAME W/MASONRY EXT WALLS,COMM BLDG ON CORN LOT.BLDG DIVIDED INTO 4 SPACES UND 1 BIN.EXP1 NORTH WALL LOAD BEAR&DAMAGED AT 1 STRY PORT OF BLDG BY VEHICLE IMPACT ON 8/13/18.REMEDY:INSTALL TB FENCE TO ESTAB COLL ZONE.FENCE BE LOC 8' MIN FROM EXP 1 WALL&TO RETURN AT NE CORN OF BLDG.FILE PERM W/2DAYS
Mar 21, 2018 V*-DOB VIOLATION - DISMISSED AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
Mar 21, 2018 V*-DOB VIOLATION - DISMISSED AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION