NYC Building Report

Brooklyn Prospect Heights

265 Flatbush Avenue, Brooklyn

DOB violations

Department of Buildings violations attached to this BIN or tax lot.

18 records

Date Status Type Summary
Nov 14, 2025 V-DOB VIOLATION - ACTIVE LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
Sep 23, 2024 V-DOB VIOLATION - ACTIVE LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION
Jun 30, 2023 V-DOB VIOLATION - ACTIVE LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION
Jun 30, 2023 V-DOB VIOLATION - ACTIVE LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION
Jun 20, 2023 V-DOB VIOLATION - ACTIVE LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION
Jun 20, 2023 V-DOB VIOLATION - ACTIVE LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION
Apr 25, 2023 V-DOB VIOLATION - ACTIVE LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION
Jan 27, 2021 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL STRUCTURE RENDERED NON-COMPLIANT. AT TIME OF INSPECTION DAMAGE OBSERVED TO HAVE BEEN SUSTAINED TO ROOF WITH MINOR DAMAGE (PROBING HOLES) DUE TO FIRE AT 267 FLATBUSH AVENUE.
Jan 17, 2020 V-DOB VIOLATION - ACTIVE LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT
Dec 23, 2017 V-DOB VIOLATION - ACTIVE P-PLUMBING NONE THE BOROUGH COMMISIONER HAS ISSUED A NOTICE TO REVOKE APPLICATION #340 000830 DUE TO REVOCATION OF THE MASTER PLUMBERS AND/OR FIRE SUPPRESSIO N LICENSE.ALL WORK IN CONNECTION WITH THIS APPLICATION HAS BEEN ORDERE D STOPPED IMMEDIATELY
Jan 23, 2015 V*-DOB VIOLATION - DISMISSED IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL
Jan 22, 2015 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FAILURE TO MAINTAIN BLDG. BLDG HAS FIRE DAMAGES THROUGHOUT. WOOD FLOOR JOIST AT 2ND FL ARE SEVERELY CHARRED & STRUCTURALLY DEFECTIVE.CEILING & WALL FINISHES PARTIALLY COLLAPSED THROUGHOUT OWNER TO IMMEDIATELY HAVE LICENSED PE TO INSPECT & EVALUATE ENTIRE BLDG,& OBTAIN PERMITS FOR REPAIR OR REPLACEMENT
Jan 21, 2015 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FAILURE TO MAINTAIN DUE TO FIRE
May 15, 2014 V-DOB VIOLATION - ACTIVE LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT
Mar 1, 2013 V-DOB VIOLATION - ACTIVE LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2011 INSPECTION REPORT
Dec 31, 2009 V-DOB VIOLATION - ACTIVE LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
Jan 1, 2009 V-DOB VIOLATION - ACTIVE LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
Feb 13, 2004 V-DOB VIOLATION - ACTIVE LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED