NYC Building Report

Brooklyn Greenpoint

26-28 Broome St, Brooklyn

DOB violations

Department of Buildings violations attached to this BIN or tax lot.

6 records

Date Status Type Summary
Jun 29, 2020 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL FAILURE TO MAINTAIN-MASONRY CHIMNEY RPRTLY STRUCK BY LIGHTENG 6/28/20 LOC NEAR EXP3/4.APPRX 5'OF CHIMNEY-SEVERLY CRACKED-SHIFTD APPRX 2"OUT OF PLACE W/FACADE BRCK-PARTLY COLLAPSED ONTO 4FL TERRCE&GRADE.CHIMNEY PART DEMO.OWNR RETN NYSPE EVAL ENTRE BLDG&PREP REPR PLNS.CHIMNEY/BLDG REPAIRED UNDER PERMIT STARTING BY 08/17/2020 COMPLETED BY 10/02/2020
Jun 29, 2020 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL EMERG WORK:MASN CHIMNY STRUCK BY LIGHTNING 6/28/20,NEAR EXP3/4 CORNER APROX TOP 5'OF CHIMNY AFFECT'D W/BRICK FACDE PART COLLAP&CHIMNY SHIFTD ROTATD APROX 2"OUT OF PLUMB HORIZ CRACK@EXP1,3,4.CHIMNY UNSTABLE.OWNER IMMD RETN LIC PLUMB SHUT GAS/BOILR AS REQ.CONT PART DEMO CHIM HAND ONL WORK UNDR PE.PROVIDE MEANS&METHODS.FILE 2 DAYS.PART DEMO START 7/1/20
Jun 29, 2020 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL EMERG WORK:MASN CHIMNEY STRUCK BY LIGHTNING NEAR EXP 3/4 CORNER BRICK FACADE@CHIMNEY COLLAP@APPRX TOP 5'.MASN CHIMNEY ROTATED/SHIFTED APPRX 2'OUT OF PLUMB&AT RISK COLLAP.HORIZONTAL CRACK OBS.@ EXP1,3,4.CHIMNEY UNSTABLE.OWNER IMMED RETN LICENSE CONTRCT TO ERECT SW SHED ALONG EXP4 APPRX 45 LINEAR FEET.WRK START 6/29/20.FILE JOB 2 W/IN 2 DAY STRT WRK
Jun 28, 2020 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL STRUCTURE RENDERD NON-COMPLIANT DUE TO A LIGHTNING STRIKE, THE FOLLOWING DAMAGES OCCURED THE CHIMNEY WAS STRUCK CAUSING THE BRICKWORK TO DISLODGE. CRACK AND A SECTION OF BRICKS FELL ONTO REAR YARD AND SIDEWALK THE CHIMNEY INNER CORE IS CRACKED AND DISPLACED 3 INCHES FROM PLUMB
Mar 23, 2006 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL C-CONSTRUCTION OTHER OPTIONAL
Mar 23, 2006 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL C-CONSTRUCTION OTHER OPTIONAL