7 records

Date Status Type Summary
Apr 6, 2018 V-DOB VIOLATION - ACTIVE LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT
Jun 11, 2010 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
Feb 13, 2004 V-DOB VIOLATION - ACTIVE LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
Jun 22, 2000 VW-VIOLATION WORK WITHOUT PERMIT - ACTIVE C-CONSTRUCTION OTHER OPTIONAL WORK WITHOUT A PERMIT. WORK NOTED: AT REAR OF PREMISES ON 4TH AVE A 20 ' CURB CUT CONSTRUCTED CREATING A PARKING PAD FOR (2) OSP. NOTE: AT T IME OF INSPECTION A 1994 DODGE SUBURBAB CARAVAN SF PLATE3 N239WB AND 1 987 NISSAN SENTRA PLATE # Y123EY WERE BEING STORED ON LOT. REMEDY: OBT AINPERMIT FOR20' CURB CUT OR RESTORE TO PRIOR LEGAL HEIGHT
Jul 27, 1998 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL C-CONSTRUCTION OTHER OPTIONAL
May 29, 1998 VW-VIOLATION WORK WITHOUT PERMIT - ACTIVE C-CONSTRUCTION OTHER OPTIONAL WORK WITHOUT A PERMIT. METAL PARTITIONS HAS BEEN ERECTED ON THE FIRST FLOOR REMEDY: STOP ALL WORK UNTIL PERMIT IS OBTAINED
Feb 10, 1997 V-DOB VIOLATION - ACTIVE LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED