Brooklyn Bushwick (West)
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
2 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Mar 3, 2015 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT |
| Mar 16, 2000 | VW-VIOLATION WORK WITHOUT PERMIT - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | WORK WITHOUT PERMIT. WORK NOTED: 1ST FLOOR REAR ERECTED EXTENSION TO BUILDING STRUCTURE APPROX 20'X 30' CONCRETE MASONRY BLOCK. 1ST, 2ND & 3RD FLOORS ALTERATION OF APTS INTERIOR WALL, PARTITION AT VARIOUS LOCATIONS. REMEDY: STOP ALL WORK. MAKE SITE SAFE IMMEDIATELY. OBTAIN A PERMIT IF FEASIBLE OR RESTORE TO PRIOR LEGAL CONDITION.CALL 802-4035 |