Brooklyn Bedford-Stuyvesant (West)
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
10 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Mar 16, 2026 | V*-DOB VIOLATION - DISMISSED | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | SEAL ALL OPEN WINDOWS AT BASEMENTS, 1ST FLOOR, 2ND FLOOR, AND 3 FLOOR SECURE OPENINGS TO PROTECT THE BUILDING AND THE PUBLIC |
| Mar 14, 2026 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | DUE TO FIRE PREMISES DAMAGED THROUGHOUT WITH PARTIALLY COLLAPSED FLOOR AND STAIRCASE AT 2ND FLOOR WITH CHARRED JOIST THROUGHOUT OWNER TO HIRE NYSPE TO SUBMIT REPORT TO DOB TO ERTINPSETIONS@BUILDINGS .NYC.GOV WITHIN 7 DAYS WITH PLANS , PHOTOS OF REPAIRS OF TIME LINE |
| Mar 14, 2026 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |
| Sep 14, 2022 | V*-DOB VIOLATION - DISMISSED | COMPBLD-STRUCTURALLY COMPROMISED BUILDING NONE | FAILURE TO SUBMIT AN ACCEPTABLE INSPECTN RPT FOR STRUCTURALLY COMPROMISED BLDG. |
| Mar 3, 2021 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Mar 3, 2021 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Mar 3, 2021 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Mar 3, 2021 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Jul 23, 2018 | V*-DOB VIOLATION - DISMISSED | UB-UNSAFE BUILDINGS NONE | UB-UNSAFE BUILDINGS NONE |
| Feb 4, 2017 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | DUE TO FIRE |