Brooklyn East New York (North)
HPD violations
Housing Maintenance Code violations are filed by tax lot (BBL 3-04019-0118), so they can include other buildings on the same lot.
4 records
| Date | Class | Status | Apartment | Summary |
|---|---|---|---|---|
| Apr 2, 2015 | B | NOV SENT OUT | 2 | SECTION 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR ALL WALLS AND CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 2, 2nd STORY |
| Apr 2, 2015 | B | NOV SENT OUT | 2 | SECTION 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR ALL WINDOW FRAMES THROUGHOUT (STOOL, CASINGS AND JAMBS) IN THE ENTIRE APARTMENT LOCATED AT APT 2, 2nd STORY |
| Apr 2, 2015 | A | NOV SENT OUT | 2 | SECTION 27-2005 ADMIN. CODE: REFIT AND MAKE OPERABLE WINDOWS THROUGHOUT (UPPER AND LOWER SASHES) IN THE ENTIRE APARTMENT LOCATED AT APT 2, 2nd STORY |
| Apr 2, 2015 | B | NOV SENT OUT | 2 | SECTION 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR CEILING IN THE 4th ROOM FROM NORTH AT EAST LOCATED AT APT 2, 2nd STORY |