NYC Building Report

Brooklyn Bushwick (West)

245 Troutman Street, Brooklyn

DOB violations

Department of Buildings violations attached to this BIN or tax lot.

6 records

Date Status Type Summary
Apr 15, 2025 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER. OBSERVED HAIRLINE CRACKS IN FACADE ON EXPOSURE 1 EAST ELEVATION. REMEDY: REPAIR AND/OR REPLACE
Oct 22, 2024 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. AT TIME OF INSPECTION OBSERVED AT EXPOSURE #1 MULTIPLE CRACKS, MULTIPLE LOCATION THROUGHOUT THE FACADE AT VARIOUS LEVELS. OBSERVED CRACK AT GROUND LEVEL ACROSS BOTTOM OF BUILDING. REMEDY: REPAIR AND/OR REPLACE
Jun 20, 2024 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL EMERGENCY WORK ORDER.NOTE OBSERVED ON AN OCCUPIED PARKING STRUCTURE OF 2 LEVELS,CRACKED SPALLED CONCRETE BEAMS,CONCRETE SLAB,EXPOSED REBAR,RU STED REBAR AT LEVELS 1&2 OF VARIOUS LOCATIONS CAUSING IMMEDIATE HAZARD TO PUBLIC AND TRAFFIC PASS THROUGH.REMEDY:IMMEDIATE PROVIDE SAFETY MEA SURES AND OWNER TO RETAIN A NYS REG PROFESSIONAL TO SUPERVISE WORKS
Jun 6, 2024 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER.AT THE TIME OF INSPECTION,OBSERVED AT EXP1 MULTIPLE CRACKS IN MULTIPLE LOCATIONS THRO UGHOUT THE FACADE AT DIFFERENT ELEVATION.REMEDY:REPAIR OR REPLACE
Jun 6, 2024 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL EMERGENCY WORK ORDER DU TO BOWING BULGING WALL AT GROUND LEVEL OF EXPOSURE #1 SOUTH ELEVATIN. REMEDY: IMMEDIATELY REMOVE LOOSE HAZARDOUS MATERIAL NOTED IMMEDIATELY PROVIDE SAFETY MEASURES UNDER DIRECTION OF A LICENSED PROFESSIONAL
Jun 6, 2024 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER. NOTE AT TIME OF INSPECTION OBSERVED BOWING BULGING WALL AT GROUND LEVEL OF EXPOSURE #1 SOUTH ELEVATION. REMEDY: OWNER TO HIRE NYSPE TO SUBMIT REPORT TO FACADES@BUILDINGS.NYC.GOOV BY ADDRESSING ALL CONDITIONS W/PLANS AND RECOMMENDING TIME FRAME AND REPAIRS TO BE COMPLETED