Brooklyn Crown Heights (North)
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
1 record
| Date | Status | Type | Summary |
|---|---|---|---|
| Apr 10, 2025 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | WORK BEING DONE AT REAR OF BUILDING. ATOI OBSERVED ENTIRE 1ST FLOOR EXTERIOR WALL REMOVED AT EXP 3, REAR OF BUILDING. AND I-BEAM, LALLY COLUMN AND PLYWOOD TEMP WALL ERECTED. ALL WORK OBSERVED IS BEING DONE WITH NO PERMIT OR DOC ON FILE WITH THE DEPARTMENT, TO DETERMINE WITH STRUCTURAL STABILITY/ SAFETY IN THIS 3 STORY 4 UNIT MULTIPLE DWELLING. |