NYC Building Report

Brooklyn Bedford-Stuyvesant (East)

239 Marion Street, Brooklyn

DOB violations

Department of Buildings violations attached to this BIN or tax lot.

2 records

Date Status Type Summary
May 14, 2001 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL C-CONSTRUCTION OTHER OPTIONAL
Aug 10, 1999 VW-VIOLATION WORK WITHOUT PERMIT - ACTIVE C-CONSTRUCTION OTHER OPTIONAL WORK WITHOUT A PERMIT. IN CELLAR, ERECTED WALLS CREATING A 3 PC BATH- ROOM WITH BATH TUB. A GAS LINE ABOUT 5' IN LENGTH EXTENDS FROM THE CEILING AND LOT AND COLD WATER PIPES WERE NOTED IN A POSSIBLE KITCHEN AREA REMEDY: OBTAIN PERMITS OR RESTORE PREMISES TO PRIOR LEGAL CONDITION