Brooklyn Bedford-Stuyvesant (East)
237 Marcus Garvey Boulevard, Brooklyn
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
6 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Aug 13, 2025 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | REQUESTIN ENGINEERS REPORT FOR STRUCTURAL STABILITY DUE TO DCORATIVE M ASONARY STONE AT FOURTH FLOOR WINDOW FELL ONTO SIDEWALK. REMAINDER OF FACADE IN STATE OF DISREPAIR. OWNER TO HIRE NYSPE TO SUBMIT TO ERTINSPECTIONS@BUILDINS.NYC.GOV WITHIN 7 DAYS ADDRESSIND ALL CONDITION S W/PLANS , PHOTOS AND TIME FRAME OF REPAIRS TO BE DONE |
| Apr 25, 2023 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION |
| Nov 8, 2019 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT |
| Jan 12, 2017 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FM BLDG.SOUTH BRICK MASONRY EXT FACADE WALL INCLUDE DEFECT LOOSE BRICK &MISSING MORTAR.PARTY WALL BRICK IS WEATHERING&BEING DAMAGED OVER TIME CRACKS AT CORNER OF SOUTH WALL AT MARCUS GARVEY BLVD.REMEDY:CEMENT PARGE,POINTUP,REPLACE&REPAIR BRICK WALLS.REMOVE ANY LOOSE FALLING HAZARD BRICK IMMED.ASSESS BRICK MASONRY WALL TIE SPACING AT SOUTH WALL |
| Dec 24, 2008 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |
| Jul 3, 2006 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |