Department of Buildings violations attached to this BIN or tax lot.
32 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Aug 28, 2026 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER AS PER SECTION 28-301.1 OF THE NYC ADMIN CODE.NOTED AT TIME OF INSPECTION AT EXPOSURE 1,BROKEN GLASS AT MAIN ENTRANCE.ALSO NUMEROUS WINDOW OPENINGS WITHOUT WINDOWS,LOOSE WOOD AT FRAMES OF WINDOWS.REMEDY:REPAIR AND/OR REPLACE |
| Apr 16, 2025 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. AT TIME OF INSPECTION, I OBSERVED ON EXPOSURE #1 SOUTH ELEVATION: WINDOW OPENING WITHOUT WINDOWS; PARAPET WALL HAS NO COPING STONE. REMEDY: REPAIR AND/OR REPLACE |
| Oct 29, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.OBSERVED SPALLED BROWN STONE AT 1 FLOOR.MISSING WINDOW AT 2ND AND 3RD FLOOR LIVING BUIL DING UNSAFE.REMEDY:MAINTAIN BUILDING.REPAIR AND/OR REPLACE |
| Jan 19, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | .FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER AT TIME OF INSPECTION OBSERVED ON EXPOSURE#4 EAST ELEVATION DAMAGED BRICK WORK ON PARAPET. REMEDY: REPAIR AND OR REPLACE PARAPET WALL BRICK WORK ON EXPOSURE#4 |
| Mar 13, 2023 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | B204 FTM BUILDING WALLS OR APPURTENANCES. OBSERRVED ON EXP1 BLDG NETTING IS LOOSE AND NOT SECURED PROPERLY. REMEDY: MAINTAIN EXTERIOR BUILDING WALL |
| Sep 14, 2022 | V-DOB VIOLATION - ACTIVE | COMPBLD-STRUCTURALLY COMPROMISED BUILDING NONE | FAILURE TO SUBMIT AN ACCEPTABLE INSPECTN RPT FOR STRUCTURALLY COMPROMISED BLDG. |
| Aug 8, 2022 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FTM BUILDING IN CODE COMPLIANT MANNER-BUILDING FACADE HAS HAZARDOUS CONDITION ON EXP1 SUCH AS: OPEN HORIZONTAL CRACK STRETCHING ACROSS 3FL WINDOW LINTELS, SPALLING MASONRY COATING AT PARAPET, SPALLING WINDOW SILL AT 3FL. REMEDY: COMPLY WITH CODE, REPAIR DAMAGED FACADE |
| May 31, 2022 | V-DOB VIOLATION - ACTIVE | EGNCY-EMERGENCY NONE | REMOVE ENTIRE FRONT WALL DOWN TO 2ND FLOOR LEVEL & INSTALL TEMPORARY WEATHERPROOF WALL |
| May 27, 2022 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FTM BLDG IN CODE COMPLIANT MANNER. BUILDING FACADE IS IN A STATE OF DISREPAIR. CONDITIONS INCLUDE OPEN WINDOW FRAMES, CRACKS IN STUCCO, BULGING MASONRY. REMEDY: COMPLY WITH CODE |
| May 25, 2022 | V-DOB VIOLATION - ACTIVE | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | INSTALL NEW APPROX 30 FT W X 15 FT D SIDEWALK SHED IN FRONT YARD OF 225 WITH APPROX.5FT OVERHANGS ONTO ADJACENT PROPERTIES.REMOVE SIDEWALK SHED CURRENTLY INSTALLED IN FRONT YARD |
| Sep 2, 2020 | V-DOB VIOLATION - ACTIVE | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Sep 2, 2020 | V-DOB VIOLATION - ACTIVE | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Sep 2, 2020 | V-DOB VIOLATION - ACTIVE | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Sep 2, 2020 | V-DOB VIOLATION - ACTIVE | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Sep 2, 2020 | V-DOB VIOLATION - ACTIVE | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Nov 15, 2018 | V-DOB VIOLATION - ACTIVE | LANDMK-LANDMARK NONE | LANDMK-LANDMARK NONE |
| Nov 13, 2018 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | COMPLY WITH COMMISSIONER ORDER #333878 IMMEDIATELY |
| Nov 13, 2018 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | COMPLY WITH COMMISSIONER ORDER #333879 IMMEDIATELY |
| Feb 21, 2018 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FTM FRONT EXP1 WALL&EXP4 WALL.PREM IS 3ST+B,ATTACH,2 FAM FRAMED W/WOOD JOISTS&BRICK EXT WALLS.FRONT EXP1 WALL IN DISREPAIR W/NUMEROUS CRACKS& SPALLS IN STUCCO&OUTWARD BULGE OF WALL.LARGE STEP CRACK&HOLES IN EXP4 PARTY WALL ON 3RDFL IN REAR OF BLDG.REMEDY:PROV RPRS UND PERM W/LAND MARKS APPROVAL.OBTAIN PERM NO LATER 4/30/18.PERM SIGNOFF BY 7/27/18 |
| Feb 21, 2018 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FTM DUE TO 2 ALARM FIRE 2/13/18.PREM IS 3ST+B,ATTACH,2 FAM FRAMED W/ WOOD JOIST&BRICK EXT WALLS.MODERATE TO SEVERE FIRE DAMAGE OF 3RDFL FRAMING WHICH PART COLL.RELIEVE WALLS AT REAR OF 2ND&3RDFL COMPROMISED REAR EXP 3 WALL UNBRACED AT COLLAPSES.REMEDY:PROV RPRS UND PERM.OBTAIN PERMIT NO LATER THAN 5/25/18.PERMIT SIGNOFF NO LATER THAN 8/31/18 |
| Feb 16, 2018 | V-DOB VIOLATION - ACTIVE | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | INSTALL INTERIOR SHORING & BRACING BY LIC P.E.AT REAR APPROX.20FT W BY 15FT D AREA OF 3RD FLOOR AND ROOF TO ALLOW FIRE MARSHALS ACCESS TO COMPLETE THEIR INVESTIGATION |
| Feb 14, 2018 | V-DOB VIOLATION - ACTIVE | UB-UNSAFE BUILDINGS NONE | UB-UNSAFE BUILDINGS NONE |
| Feb 13, 2018 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | DUE TO FIRE |
| Oct 4, 2017 | V-DOB VIOLATION - ACTIVE | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Aug 9, 2017 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Aug 9, 2017 | V-DOB VIOLATION - ACTIVE | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Mar 7, 2012 | V-DOB VIOLATION - ACTIVE | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Apr 6, 2011 | V-DOB VIOLATION - ACTIVE | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| May 10, 2001 | VW-VIOLATION WORK WITHOUT PERMIT - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | WORK WITHOUT A PERMIT. WORK NOTED: SIDEWALK SHED ERECTED AT FRONT OF PREMISES REMEDY: OBTAIN A PERMIT |
| May 10, 2001 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | HAZARDOUS |
| Mar 30, 1999 | V-DOB VIOLATION - ACTIVE | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL |
| Feb 9, 1999 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | HAZARDOUS |