Brooklyn Carroll Gardens-Cobble Hill-Gowanus-Red Hook
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
10 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Nov 14, 2025 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION |
| Jun 30, 2023 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION |
| Jun 30, 2023 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION |
| Jun 20, 2023 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION |
| Jun 20, 2023 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION |
| Apr 25, 2023 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION |
| Sep 16, 2022 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO COMPLY W/THE COMMISSIONER'S ORDER 340789(070822FEU30608ZT) DATED 07/08/22 REQUIRING THE OWNER TO START BLDG REPAIRS UNDER PERMIT FOR THE FACADE DAMAGES. AS OF 09/16/22 THERE ARE NO JOBS FILED IN DOB NOW OR BIS TO REPAIR THE BLDG. REMEDY: IMMED COMPLY W/THE COMM ORDER 340789(070822FEU30608ZT)TO REPAIR THE BLDG UNDER PERMIT |
| Jul 11, 2022 | V-DOB VIOLATION - ACTIVE | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | PLEASE INSTALL 20'FT LINEAR FEET OF SIDEWALK SHED TO SERVE AS MEANS OF OVERHEAD PROTECTION FOR PEDESTRIANS USING THE SIDEWALK AT THE FRONT OF THE BUILDING AT EXP#1 |
| Jul 8, 2022 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAIL TO MAINTAIN-EXP1 FACADE FACE BRCKS LOOSE,BULGING OUTWRD& DTACHING FROM BACK UP WALLS(INTRIOR WALL).WNDW FRAMES SVRLY DTRIORTDEXP3 WALL SPALLING &CRCKS ALNG CHMNEY.EXP4 EXCESSIVE MOLD DUE MOISTURE OWNR RTAIN NYSPE-EVALU ENTIRE BLDG & PREPARE/FILE RPR DWGS RPRS START UNDR PRMT BY 8/15/22 &CMPLT/SIGND OFF BY 10/19/22 |
| May 18, 2016 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |