NYC Building Report

Brooklyn Bushwick (West)

22 Sumner Place, Brooklyn

DOB violations

Department of Buildings violations attached to this BIN or tax lot.

10 records

Date Status Type Summary
Feb 22, 2024 V*-DOB VIOLATION - DISMISSED FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024
Oct 26, 2020 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
Sep 25, 2019 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
May 29, 2019 V*-DOB VIOLATION - DISMISSED AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
Nov 14, 2016 V*-DOB VIOLATION - DISMISSED ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2014 CAT 1 INSP/TST
Aug 23, 2016 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
May 27, 2014 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
Apr 4, 2013 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
Jun 24, 2009 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL FAILURE TO PROVIDE PROTECTION AT SIDE OF EXCAVATION. CONTRACTORR EXCA VATED APPROX. 60 FT. SHEAR CUT APPROX. 13 FT. DEEP REMEDY: STOP ALL WORK. CALL DOB FOR REINSPECTION. PROVIDE PROTECTIO N GIVE STABLE ANGLE OF REPOSE 45% OR FLATTER
May 4, 2009 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUEMNTS AND/OR APPROV ED AMENDMENTS NOTED: OBSERVED AT TIME OF INSPECTION SHEETING/SHORING NOT CONFORMING TO APPROVED PLANS 3X8 USED FOR LAGGING NOT 3X12 AS PER PLANS/RACKERS INSTALLED ON WRONG SOLIDER PILES/NO WHALER INSTALLED REMEDY: CONFORM TO APPROVED DOCUMENTS OR AMENDMENTS CALL EXCAVATION UN