Brooklyn Bedford-Stuyvesant (West)
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
11 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Jun 9, 2022 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO COMPLY WITH DOB VIOLATION #052022FEU30301BS(CONTROL#340636) ISSUED ON MAY 20, 2022 VIOLATION REQUIRED IMMED INSTALLATION OF MONITORING AT EXP2 BEAMING WALL AT DIRECTION OF PE W/PE TO SUBMIT WEEKLY STABILITY REPORTS TO DOB-FEU. NO STABILITY REPORT SUBMITTED TO DATE. REMEDY: COMPLY W/DOB VIO#052022FEU30301BS IMMED |
| Jun 9, 2022 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO COMPLY W/DOB VIOLATION#031822FEU30302BS(CONTROL#357392) ISSUED ON MARCH 18 2022. VIOLATION REQUIRED A FILING FOR REPAIRS AND LEGALIZATION OF WORK W/O PERMIT BY 04/25/2022 AND REPAIR WALL TO START UNDER PERMIT BY 05/09/2022. NO PERMITS ON FILE FOR REPAIRS OR LEGALIZ AS OF 06/09/2022. REMEDY: COMPLY W/DOB VIO#031822FEU30302BS IMMED |
| Jun 8, 2022 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO COMPLY WITH DOB VIOLATION #052022FEU30301BS(CONTROL#340636) ISSUED ON MAY 20, 2022. VIOLATION REQUIRED IMMED INSTALLATION OF MONITORING AT EXP2 BEAMING WALL AT DIRECTION OF PE W/PE TO SUBMIT WEEKLY STABILITY REPORTS TO DOB-FEU. NO STABILITY REPORT SUBMITTED TO DATE. REMEDY:COMPLY W/DOB VIOLATION#052022FEU30301BS IMMED |
| May 20, 2022 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | ADDITIONAL INFO: THERE IS AN INDEPENDENT WALL @ EXP2(WEST)&PARTY WALL @ EXP4(EAST)MINOR CRACKS @ EXP1(FRONT)WALL. TOP STORY OFEXP2 WALL HAS AN APPROX 16FT W X 6FT H OUTWARD BULGE IMMED AT DIRECTION OF NYSPE, MONITOR EXP2 BEARING WALL FOR MOVEMENT UNTIL BULGING WALL REMOVED UNDER PERMIT |
| Mar 18, 2022 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | EMERG WORK-MINOR CRKS @ EXP1.APPROX 16'W X 6'H OUTWARD BULGEAT TOP STORY LEVEL OF EXP2WALL.CRACKS VISIBLE IN 3FL APT CEILING.BRICKDUST OBSERVED IN CELLAR @ EXP1/2 CORNER IMMED INSTL TEMP SHOR ALNG EXP2-END BLDG INT UNDR PEDIRECT SUPRV OF PE ONSITE W LIC CONTRCT.SUBMT SCOPE WRK 3/21/22 |
| Mar 18, 2022 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FTM-MINOR CRCKS@EXP1 WALL.TOP STORY LVL EXP2 WALL HAS APPRX16'WX6'TALL OUTWARD BULGE.CRCKS OBSVD 3RD FL APT CEILING.BRICK DUSTOBSVD IN CELLAR @EXP1/2CORNER&NEW BSMT FL FRAMNG,SUBFLR&SHORNG NO PRMT NYSPE STRCTRAL ENGNR-EVALU ENTIRE BLDG &DSGN RPRS&LEGALZTN DWGS IMMED FILE RPR&LGALZTN 4/25/22.OBTN PRMT&STRT WRK 5/9/22 |
| Mar 18, 2022 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | STRUCTURE RENDERED NON-COMPLAINT AT TIME OF INSPECTION DAMAGE OBSERVED TO HAVE BEEN SUSTAINED TO EXPOSURE 2 WALL BULGING AT 2ND AND 3RD FLOOR LEVEL VACATE ENTIRE BUILDING |
| Mar 17, 2022 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | OBSERVED EXTERIOR BRICK FA ADE WALL INSTATE OF DISREPAIR CONDITIONS WITH BULGING, HORIZONTAL & VERTICAL CRACKS THROUGHOUT ON EXPOSURE # 02 AT 2ND & 3RD FLOOR LEVEL. SUBMIT AN ENGINEER'S REPORT TO DETERMINE EXTERIOR WALL STRUCTURAL STABILITY. |
| Mar 8, 2022 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | STRUCTURE RENDERED NON-COMPLIANT |
| Jul 13, 2009 | VW*-VIOLATION - WORK W/O PERMIT DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |
| Jun 23, 2008 | V*-DOB VIOLATION - DISMISSED | UB-UNSAFE BUILDINGS NONE | UB-UNSAFE BUILDINGS NONE |