Nov 14, 2025 V-DOB VIOLATION - ACTIVE LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
Sep 23, 2024 V-DOB VIOLATION - ACTIVE LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION
May 15, 2014 V*-DOB VIOLATION - DISMISSED LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT
Mar 1, 2013 V*-DOB VIOLATION - DISMISSED LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2011 INSPECTION REPORT
Aug 13, 2009 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL BOROUGH COMMISIONER HAS ISSUED A 15 DAY LETTER OF INTENT TO REVOKE APP L# 30222315411 ON 08/10/08 100% COMPLETE REMEDY; STOP ALL WORK, MAKE SITE SAFE, CONTACT DOB
Jan 1, 2009 V*-DOB VIOLATION - DISMISSED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
Jan 3, 2008 V*-DOB VIOLATION - DISMISSED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
May 9, 2007 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL FIRST FLOOR APARTMENTS 1L & 1R GUTTED APPROX 10'X 4"IN FLOOR OF APT 1R WITH FLOOR JOISTS TEMPORARY SUPPORTED,EXCAVATED CELLAR APPROX 3'D AND UNDERPINNING AT EXISTING FOUNDATION,TEMPORARY SUPPORT FOR WOOD GIRDER, EXCAVATED AREA AT REAR YARD APPROX25'X15'7'D,PERIMETER FOOTING INSTALL REMEDY:STOP ALL WORK,MAKE SAFE,GET PERMIT,CALL DOB PRIOR TO WORK
May 9, 2007 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL EXCAVATED AREA AT REAR YARD APPROX 25'W X15'D X7'D EXCAVATION SPANS TO ADJACENT PROPERTY-210 & 214 FREEMAN STREET,NO CONSTRUCTION FENCE PROVI DED AT BOTH SIDES REMEDY:STOP ALL WORK,MAKE SAFE,PROVIDE SITE FENCE,CALL DEPT OF BLDGS @ (718/802/3707)PRIOR TO FURTHER CONSTRUCTION
May 9, 2007 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL NO GUARD RAILS PROVIDED FOR FLOOR OPENING AT 1ST FLOOR,OPENING SIZE APPROX.(10'X4)(4'X5')(4X3)ALSO NO GUARD RAILS FOR STAIRS REMEDY:STOP ALL WORK,MAKE SAFE,PROVIDE GUARD RAILS,CALL DOB PRIOR TO FURTHER CONSTRUCTION(718/802/3707)
May 9, 2007 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL FAILURE TO FILE T.R.I.FORM(CONTROLLED INSPECTOR STATEMENT OF RESPONSA- BILITY)PRIOR TO COMMENCEMENT OF CONTROLLED UNDERPINNING.NOTE:UNDER PINNING DONE AT EXISTING FOUNDATION WALLS AT 4 SIDE IN CELLAR REMEDY:STOP ALL WORK,MAKE SAFE,FILE T.R.I.FORM,CALL DOB@(718/802/3707) PRIOR TO FURTHER CONSTRUCTION
May 9, 2007 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL AT REAR OF PREMISES(SOUTH SIDE)EXCAVATED AREA APPROX.25'X15'X7'D & NO SHEETING AND SHORING PROVIDED,NOW SHEER CUT AT 3 SIDE REMEDY:STOP ALL WORK,MAKE SAFE,OBTAIN A PERMIT AND PROVIDE BACKFILL OR SHORING,CALL DOB @(718/802/3707) PRIOR TO FURTHER CONSTRUCTION
Jan 31, 2005 V*-DOB VIOLATION - DISMISSED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED