NYC Building Report

Brooklyn Carroll Gardens-Cobble Hill-Gowanus-Red Hook

209 12 Street, Brooklyn

DOB violations

Department of Buildings violations attached to this BIN or tax lot.

8 records

Date Status Type Summary
Nov 14, 2025 V-DOB VIOLATION - ACTIVE LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
Nov 6, 2008 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL C-CONSTRUCTION OTHER OPTIONAL
Nov 6, 2008 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL STOP ALL WORK AT ALL APTS.(ALL WORK UNDER JOB # 310186553) PROVIDE APP ROVED PLANS AT SITE,CONTACT THE DOB BEFORE RESUMING WORK,KEEP SITE SAF E
Oct 2, 2008 VW-VIOLATION WORK WITHOUT PERMIT - ACTIVE C-CONSTRUCTION OTHER OPTIONAL OBTAIN ALL NECESSARY PERMITS FORTHWITH TO LEGALIZE CONDITION
Oct 2, 2008 VW-VIOLATION WORK WITHOUT PERMIT - ACTIVE C-CONSTRUCTION OTHER OPTIONAL STOP ALL WORK,OBTAIN ALL NECESSARY PERMITS
Oct 2, 2008 VW-VIOLATION WORK WITHOUT PERMIT - ACTIVE C-CONSTRUCTION OTHER OPTIONAL OBTAIN ALL NECESSARY PERMITS FORTHWITH TO LEGALIZE
Jan 3, 2008 V*-DOB VIOLATION - DISMISSED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
Jan 28, 1999 VW-VIOLATION WORK WITHOUT PERMIT - ACTIVE C-CONSTRUCTION OTHER OPTIONAL WORK WITHOUT A PERMIT. WORK NOTED: RENOVATION AT 4TH FL RIGHT APT PARTITIONS ERECTED LAVATORY, TUB & WATER CLOSET REMOVED FROM ORIGINAL LOCATION AND NEW BATHROOM INSTALLED. PLUMBING FIXTURES INSTALLED, NEW BX CABLES INSTALLED THRU OUT APT. STOP ALL WORK. REMEDY: STOP ALL CON STRUCTION WORK. OBTAIN ALL NECESSARY PERMITS AND APPROVALS (802-2685)