Brooklyn Canarsie
2082 Rockaway Parkway, Brooklyn
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
7 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Feb 22, 2024 | V*-DOB VIOLATION - DISMISSED | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | SEAL ALL OPENINGS CAUSED BY VEHICLE IMPACT TO PROTECT THE PUBLIC |
| Feb 21, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | AT TIME OF INSPECTION OBSERVED AT EXP. 1 , STOREFRONT SHIFTED INWARD AT BOTTOM OF WALL, STORE WINDOW GLASS BROKEN , RIGHT SIDE OF ROLL GATE FRAME DAMAGED DUE TO VEHICLE IMPACT TO STOREFRONT. VACATE STOREFRONT INTERIOR SPACE 15'X 4' FROM EXPOSURE 4 WALL. |
| Jun 12, 2023 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | STRUCTURE RENDERED NON COMPLAINT. AT TIME OF INSPECTION OBSERVED, STORE FRONT AND ROLL DOWN GATE SHIFTED,DOOR FRAME DISPLACED AND WALL DAMAGED AND SHIFTED AT 2092 AND 2090 ROCKAWAY PARKWAY BK DUE CAR STRIKES BUILDING. VACATE STORE 2092 AND 2090 ROCKAWAY PARKWAY. |
| Jun 12, 2023 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | AT TIME OF INSPECTION OBSERVED, STORE FRONT AND ROLL DOWN GATE SHIFTED,DOOR FRAME DISPLACED AND WALL DAMAGED AND SHIFTED AT 2092 AND 2090 ROCKAWAY PARKWAY BK DUE CAR STRIKES BUILDING. |
| May 28, 2018 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | DUE TO VEHICULAR IMPACT |
| Jul 4, 2014 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | DUE TO VEHICLE ACCIDENT |
| May 16, 2014 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | DUE TO CAR INTO THE BUILDING |