NYC Building Report

Brooklyn Greenpoint

208 Freeman Street, Brooklyn

DOB violations

Department of Buildings violations attached to this BIN or tax lot.

4 records

Date Status Type Summary
Jan 19, 2022 V*-DOB VIOLATION - DISMISSED AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
Jan 19, 2022 V*-DOB VIOLATION - DISMISSED AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
May 5, 2016 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL FAILURE TO MAINTAIN UNPERMITTED EXCAVATION & FOUNDATION,REMOVAL WITH OUT SUPPORT OF EXCAVATION,WITH OUT NOTIFYING DOB,WITH OUT PROTECTIONS REQUIRED & SOIL/FOUNDATION WORK WHICH AFFECTED ADJOINING 210 FREEMAN REMEDY:RETAIN NYS PE ENGINEER TO EVALUATE THE CONDITIONS AND OT OBTAIN PERMITS FOR REPAIRS NO LTR THAN 5/26/16 & ENGAGE A CONTRACTOR 6/6/2016
Apr 20, 2016 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL EMERG WORK, IMPROPER EXCAVATION & UNPERMITTED UNDERPINNING OPERATIONS IN THE CELLAR HAVE RENDERED FOUNDATION WALLS COLLAPSED & BLDG IS UNSTABLE & DANGER TO THE PUBLIC.IMPROPER WORK ALSO CAUSED COLLAPSE OF FOUNDATION WALL @ 210 FREEMAN ST WHICK REQUIRES IMMED SHORING.REMEDY: OWNER TO IMM SHORE BLDG.START SHORING MO LATER THAN APRIL 21,2016