Brooklyn Williamsburg
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
15 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Feb 24, 2021 | V-DOB VIOLATION - ACTIVE | E-ELEVATOR ELEVATORREQUIRED | E-ELEVATOR ELEVATORREQUIRED |
| Feb 19, 2020 | V*-DOB VIOLATION - Resolved | E-ELEVATOR ELEVATORREQUIRED | E-ELEVATOR ELEVATORREQUIRED |
| Jan 31, 2019 | V*-DOB VIOLATION - Resolved | E-ELEVATOR ELEVATORREQUIRED | E-ELEVATOR ELEVATORREQUIRED |
| Feb 9, 2018 | V*-DOB VIOLATION - Resolved | E-ELEVATOR ELEVATORREQUIRED | E-ELEVATOR ELEVATORREQUIRED |
| Aug 17, 2017 | V*-DOB VIOLATION - Resolved | E-ELEVATOR ELEVATORREQUIRED | E-ELEVATOR ELEVATORREQUIRED |
| Feb 18, 2016 | V*-DOB VIOLATION - Resolved | E-ELEVATOR ELEVATORREQUIRED | E-ELEVATOR ELEVATORREQUIRED |
| Jun 10, 2015 | V*-DOB VIOLATION - DISMISSED | EVCAT1-ELEVATOR ANNUAL INSPECTION / TEST ELEVATORREQUIRED | VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2014 INSPECTION/TEST |
| Nov 16, 2011 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Nov 16, 2010 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | STOP ALL WORK,MAKE SITE SAFE,COMPLY WITH THE STOP WORK ORDER AND COMMI SSIONER'S ORDER |
| Feb 4, 2008 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |
| Sep 28, 2007 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO PROVIDE APPROVED PLANS ON SITE. NOTED:.UNDERPINNING WORK AT 201 N 7 STREET COMPLETE WITH DETAILS TO WORK NOT PROVIDED AT TIME OF INSPECTION REMEDY: PROVIDE APPROVED PLANS WITH DETAILS TO UNDERPINNING TO 201-47 STREET |
| Sep 28, 2007 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO ADEQUATELY SUPPORT ADJ GROUND/STRUCTURE AFFECTED BY EXCAVATION UPON INSPECTION OF ABOVE ADDRESS SHEETING AND UNDERPINNING ALONG ADJ PROPERTY 207 N 7 STREET, APPROX 20' OF SHEER CUT NOT PROPERL PROPERLY PROTECTED. NO PROTECTION FOR EXCAVATED SITE PROVIDED FOR SIDEWALK REMEDY:SW, PROVIDE SHEETING, BRACING,UNDERPINNING.,45 DEG ANG |
| Sep 28, 2007 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | SOLDIER PILES AND MICRO PILES SEQUENCE OF CONSTRUCTION DOES NOT CONFORM TO APPROVED PLANS. NOTED: UNDER APP #301903643 PLAN SECTION DETAIL 05174 - 3 STATES AND SHOWS SOLDIER PILES TO BE INSTALLED BEFORE MICRO PILES. METHOD USED MICRO PILES INSTALLED FIRST. STOP ALL WORK REMEDY: CONFORM TO PLAN OR SUBMIT AMMENDED PLAN FOR APPROVAL BY DEPT |
| Jul 27, 2007 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |
| Nov 8, 2000 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |