NYC Building Report

Brooklyn Carroll Gardens-Cobble Hill-Gowanus-Red Hook

205-207 King St, Brooklyn

DOB violations

Department of Buildings violations attached to this BIN or tax lot.

23 records

Date Status Type Summary
Oct 14, 2025 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL EWO: 1 STORY STRUCTURE W/MASONRY BRICK, EXTERIOR FACADE @ EXP1 VERTICA & HORIZONTAL CRACKS CAUSE SEPARATION & LOOSE MORTAR BETWEEN BRICK IN DANGER OF FALLING INTO SIDEWALK PUBLIC. REMEDY:IMMEDIATELY INSTALL ADEQUATE SAFE MEASURES TO PROTECT PUBLIC. RETAIN NYS PROFESSIONAL ENG TO EVALUATE FACADE STABALIZING/REPAIRING THE STRUCTURE BY 10/28/2025
Dec 5, 2023 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FTM.ON 11/9/23,OBSRVD MASONRY WALLS IN STATE OF DISREPAIR W/DIAGONAL CRACKS&IMPROPERLY ENCLOSED OPENING W/UNENGINEERED LINTEL.COMPLY IMMEDIATELY WITH CONTROL #343309
Dec 5, 2023 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FTM.ON 11/9/23,OBSRVD ROOF IN STATE OF DISREPAIR W/WATERE DAMAGE & SAGGNG,LEAVNG TUSSES IMPROPERLY BRACD.OBSRVD MASONRY PERIMETER WALLS IN STATE OF DISREPAIR W/DIAGONAL CRCKS THROUGHOUT&IMPROPERLY ENCLOSED COMPLY IMMEDIATELY WITH CONTROL #343307
Dec 5, 2023 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FTM.ON 11/9/23,OBSRVD ROOF IN STATE OF DISREPAIR W/WATERDAMAGE & SAGGNG LEAVNG TRSSES IMPROPERLY BRACED.OBSRVD MASONRY PERIMETER WALLS IN STATE OF DISREPAIR W/DIAGONAL CRCKS THROUGHOUT.COMPLY IMMEDIATELY WITH CONTROL #343306
Nov 9, 2023 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FTM.ON 11/9/23,OBSRVD ROOF IN STATE OF DISREPAIR W/WATERDAMAGE&SAGGNG LEAVNG TRESSES IMPROPERLY BRACED.OBSRVD MASONRY PERIMETER WALLS IN STATE OF DSREPAIR W/DIAGONAL CRCKS THROUGHOUT.1.IMMED VACATE PREMISES, 2.OWNR TO ENGAGE NYS PE&ENCLOSED CNTRCTR TO EVAL THE ENT BLDG.OBTN PRMTS TO RPAIR BY 11/30/23
Nov 9, 2023 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FTM.ON 11/9/23,OBSRVD MASONRY WALLS IN STATE OF DISREPAIR W/DIAGONAL CRACKS&IMPROPERLY ENCLOSED OPENING W/UNENGINEERED LINDEL.OWNR TO ENGAGE NYS PE&ENDORSD CNTRCTR TO EVAL THE ENT BLDG OBTAIN PRMTS TO RPAIR BY 11/30/23.RPAIR PRMT TO BE SGND OFF BY 12/21/2023
Nov 9, 2023 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FTM.ON11/9/23,OBSRVD ROOF IN STATE OF DISREPAIR W/WATER DAMAGE&SAGGNG, LEAVING TUSSES IMPROPERLY BRACD.OBSRVD MASONRY PERIMETER WALLS IN STATE OF DISREPAIR W/DIAGONL CRCKS THROUGHOUT&IMPEROPERLY ENC.1.IMMED VACATE(VACATE ORDER EXISTS),2.OWNR TO ENGAGE NYSPE&ENDORSD CNTRCTR TO EVAL THE ENT BLDG.OTHER PRMTS TO RPAIR BY 11/30/23
Nov 2, 2023 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL FAILURE TO MAINTAIN BUILDING IN CODE COMPLAINT MANNER. WOODEN TRUSS ROOF STRUCTURAL INTEGRITY IS QUESTIONABLE. ROOFS UNDERSIDE EXPERIENCED WATER DAMAGE & NEGLECT, EXPOSING THE WOOD TRUSS TO CORROSION. REQUEST FOR NYSPE REPORT.
Jan 15, 2014 V*-DOB VIOLATION - DISMISSED AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
Dec 28, 2011 V-DOB VIOLATION - ACTIVE AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
Oct 6, 2011 VPW*-VIOLATION UNSERVED ECB-WORK WITHOUT PERMIT-DISMISSED C-CONSTRUCTION OTHER OPTIONAL C-CONSTRUCTION OTHER OPTIONAL
Jan 28, 2011 V-DOB VIOLATION - ACTIVE AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
Jan 28, 2011 V-DOB VIOLATION - ACTIVE AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
Jan 28, 2011 V-DOB VIOLATION - ACTIVE AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
Dec 2, 2010 V*-DOB VIOLATION - DISMISSED AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
Dec 2, 2010 V-DOB VIOLATION - ACTIVE AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
Sep 9, 2008 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL COMPLY WITH VACATE ORDER
Feb 10, 1997 V-DOB VIOLATION - ACTIVE LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
Aug 29, 1995 V*-DOB VIOLATION - DISMISSED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
Jun 1, 1994 V*-DOB VIOLATION - DISMISSED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
Aug 16, 1993 V-DOB VIOLATION - ACTIVE LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
Jun 1, 1993 V*-DOB VIOLATION - DISMISSED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
May 4, 1990 VP-VIOLATION UNSERVED ECB-ACTIVE C-CONSTRUCTION OTHER OPTIONAL C-CONSTRUCTION OTHER OPTIONAL