Brooklyn Carroll Gardens-Cobble Hill-Gowanus-Red Hook
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
6 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Jun 30, 2023 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION |
| Dec 13, 2011 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT |
| Jan 6, 2006 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Aug 23, 1999 | VW*-VIOLATION - WORK W/O PERMIT DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | WORK WITHOUT A PERMIT. WORK NOTED: 3 ROOMS ERECTED IN REAR OF COMMERCIAL AREA 1ST FLOOR REMEDY: OBTAIN PERMITS & APPROVALS FROM DOB IF FEASIBLE OR RESTORE PREMISES TO PRIOR LEGAL CONDITION |
| Jul 23, 1999 | VW*-VIOLATION - WORK W/O PERMIT DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | WORK W/O A PERMIT/WORK NOTED: GUT RENOVATION OF 2ND FLR FRONT APT BATHROOM PLASTER SURFACES REMOVED/COMPLETE DOMESTIC WATER & WATERLINE REPIPING/LPYWOOD FLOOR ELEVATED APPROX 6" ABOVE ORIGINAL FLOOR JOISTS WITH SLEEPERS. PARTITION WALL ERECTED SEPARATING FRONT FROM CENTER ROOM. REMEDY: STOP ALL WORK. MAKE SITE SAFE. OBTAIN ALL PERMITS |
| Jul 23, 1999 | V*-DOB VIOLATION - DISMISSED | ES-ELECTRIC SIGNS NONE | ES-ELECTRIC SIGNS NONE |