Brooklyn Fort Greene
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
5 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Dec 13, 2024 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | BORO COMMISSIONER HAS ORDERED ALL WORK STOPPED UNDER APPLICATION # 321592175 ON 12/13/2024 DUE TO CONSTRUCTION SUPERINTENDENT WITHDRAWAL. |
| Oct 18, 2024 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | BORO COMMISSIONER HAS ORDERED ALL WORK STOPPED UNDER APPLICATION # 321592175 ON 10/16/2024 DUE TO GENERAL CONSTRUCTOR WITHWRAWAL. |
| Oct 18, 2024 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | BORO COMMISSIONER HAS ORDERED ALL WORK STOPPED UNDER APPLICATION #321592175 ON 10/16/2024 DUE TO CONSTRUCTION SUPERINTENDENT WITH DRAWAL |
| Apr 25, 2023 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION |
| Feb 24, 2017 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT |