NYC Building Report

Brooklyn Midwood

2025 Kings Highway, Brooklyn

DOB violations

Department of Buildings violations attached to this BIN or tax lot.

6 records

Date Status Type Summary
Jun 20, 2023 V-DOB VIOLATION - ACTIVE LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION
Jun 20, 2023 V-DOB VIOLATION - ACTIVE LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION
Jan 17, 2020 V*-DOB VIOLATION - DISMISSED LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT
Mar 3, 2015 V*-DOB VIOLATION - DISMISSED LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT
Dec 28, 2011 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
Mar 27, 2009 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL STOP ALL WORK FAILURE TO PROVIDE APPROVED PLANS ON SITE AT TIME OF INS PECTION NOTED: AT TIME OF INSP AN ACTIVE SITE POURING CONCRETE FOUNDAT ION WALLS WITH A SHEER CUT APPROX 14 TO 15 FEET AND NO SOE PLANS JOB # 310207175 REMEDY: STOP ALL WORK PROVIDE PLANS CALL EXCAVATION UNIT FOR APPOINTME