Brooklyn Marine Park-Mill Basin-Bergen Beach
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
1 record
| Date | Status | Type | Summary |
|---|---|---|---|
| Dec 26, 2022 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | THE BUILDING SUSTAINED EXTENSIVE INTERIOR AND EXTERIOR FIRE WATER AND FIREFIGHTING OPERATION DAMAGES THROUGH-OUT THE STRUCTURE. THERE IS A PARTIAL COLLAPSE OF THE FIRST FLOOR, OPENING IN EXPOSURE 3 AND 4 EXTERIOR WALL. FLOOR JOISTS CHARRED ALL LEVELS. |