| Date | Status | Type | Summary |
|---|---|---|---|
| Apr 5, 2023 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO POST AND DISTRIBUTE NOTICE TO OCCUPANTS OF TPP. AT TIME OF INSPECTION OBSERVED 1 FAMILY OCCUPYING FLOORS 2 AND 3, WHILE CONSTRUCTION WITH ACTIVE PERMITS B00781566-I1-GC-CX, B00781566-S1-PL & B08012130-I1-EL TAKING PLACE AT 1ST FL, BASEMENT & INCOMPLETE CELLAR ON PSWO UNDER COMPLAINT 3878910. NO TPP PROVIDED/POSTED. |
| Oct 24, 2022 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | WORK DOES NOT CONFORM TO APPROVED PLANS# B00781566-I1. AT 3RD FLOOR (TOP LEVEL), A VERTICAL ENLARGEMENT CONSTRUCTED OUT OF C JOISTS AND METAL STUD FRAMING WITH 3 OPENINGS HAS BEEN ERECTED AT THE FRONT OF THE BUILDING. ALSO, ELECTRICAL AND MECHANICAL LINES HAVE BEEN INSTALLED IN THIS AREA. |