NYC Building Report

Brooklyn Carroll Gardens-Cobble Hill-Gowanus-Red Hook

19A Dwight Street, Brooklyn

HPD violations

Housing Maintenance Code violations are filed by tax lot (BBL 3-00524-0010), so they can include other buildings on the same lot.

318 records

Date Class Status Apartment Summary
Jul 21, 2015 C FIRST NO ACCESS TO RE- INSPECT VIOLATION 15B § 27-2005 ADMIN. CODE: REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT CEILING IN THE ENTIRE APARTMENT LOCATED AT APT 15B, 2nd STORY
Jul 21, 2015 A FIRST NO ACCESS TO RE- INSPECT VIOLATION 15B § 27-2005 ADMIN. CODE: REFIT WINDOWS IN THE ENTIRE APARTMENT LOCATED AT APT 15B, 2nd STORY
Jul 21, 2015 B FIRST NO ACCESS TO RE- INSPECT VIOLATION 15B § 27-2018 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 15B, 2nd STORY
Jul 21, 2015 B FIRST NO ACCESS TO RE- INSPECT VIOLATION 15B § 27-2005 ADMIN. CODE: PROPERLY REPAIR THE BROKEN OR DEFECTIVE VENTILATION SYSTEM IN THE KITCHEN LOCATED AT APT 15B, 2nd STORY
Jul 21, 2015 A FIRST NO ACCESS TO RE- INSPECT VIOLATION 15B § 27-2026 ADMIN. CODE: RESET, SO AS TO SECURE A PROPER AND TIGHT CONNECTION, THE WATER CLOSET BOWL .. IN THE BATHROOM LOCATED AT APT 15B, 2nd STORY
Jul 21, 2015 B FIRST NO ACCESS TO RE- INSPECT VIOLATION 15B § 27-2026 ADMIN. CODE: REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT BATHTUB IN THE BATHROOM LOCATED AT APT 15B, 2nd STORY
Jul 21, 2015 C FIRST NO ACCESS TO RE- INSPECT VIOLATION 15B § 27-2005 ADMIN. CODE: REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT CEILING IN THE BATHROOM LOCATED AT APT 15B, 2nd STORY
Jul 21, 2015 B FIRST NO ACCESS TO RE- INSPECT VIOLATION 15B § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 15B, 2nd STORY
Jul 21, 2015 B FIRST NO ACCESS TO RE- INSPECT VIOLATION 15B § 27-2024 ADMIN. CODE: PROVIDE ADEQUATE SUPPLY OF HOT WATER FOR THE FIXTURES AT WASHBASIN IN THE BATHROOM LOCATED AT APT 15B, 2nd STORY
Jul 21, 2015 B FIRST NO ACCESS TO RE- INSPECT VIOLATION 15B § 27-2005 ADMIN. CODE: PROPERLY REPAIR THE BROKEN OR DEFECTIVE DOOR IN THE 2nd BEDROOM FROM EAST AT SOUTH LOCATED AT APT 15B, 2nd STORY
Jul 21, 2015 B FIRST NO ACCESS TO RE- INSPECT VIOLATION 15B § 27-2026 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE CONNECTION LOCKNUT AT WASTELINE OF WASHBASIN IN THE BATHROOM LOCATED AT APT 15B, 2nd STORY
Dec 14, 2014 C FIRST NO ACCESS TO RE- INSPECT VIOLATION 15B § 27-2031 ADMIN. CODE: PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 15B, 2nd STORY
Jun 5, 2014 C VIOLATION CLOSED 15B § 27-2005 ADMIN. CODE: REMOVE THE ILLEGAL FASTENING TWO LOCKABLE SLIDING BOLTS ON DOOR IN THE ENTRANCE LOCATED AT APT 15B, 2nd STORY, APARTMENT AT WEST
Mar 12, 2014 B VIOLATION CLOSED 15B § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE COUNTER BALANCES AT 1ST WINDOW FROM NORTH AT EAST WALL IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 15B UPPER LEVEL, 2nd STORY, 3rd APARTMENT FROM SOUTH AT WEST
Mar 12, 2014 A VIOLATION CLOSED 15B § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT ALL WALLS AND CEILINGS THROUGHOUT IN THE ENTIRE APARTMENT LOCATED AT APT 15B, 2nd STORY, 3rd APARTMENT FROM SOUTH AT WEST
Mar 12, 2014 C VIOLATION CLOSED 15B § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING AND EAST WALL IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 15B UPPER LEVEL, 2nd STORY, 3rd APARTMENT FROM SOUTH AT WEST
Apr 29, 2013 A VIOLATION DISMISSED A SECTION 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE DOOR KNOB AT DOOR LEADING TO BASEMENT IN THE 1st ROOM FROM NORTH LOCATED AT APT A, 1st STORY
Apr 29, 2013 A VIOLATION DISMISSED A SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR WEST WALL ALONG THE FLOOR BESIDE APT ENTRANCE DOOR IN THE 1st ROOM FROM NORTH LOCATED AT APT A, 1st STORY