Brooklyn Bedford-Stuyvesant (West)
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
4 records
| Date | Status | Type | Summary |
|---|---|---|---|
| May 9, 2022 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FTM-SITE AT 200 MADISON ST. DAMAGED EXP2(EAST)PARTY WALLIN CELLAR APPROX 15FT LENGTH OF EXP2 WALL IN CELLAR COLLAPSED ATFRONT END NYSPE STRUCTURAL ENG'R TO IMMED EVAL ENTIRE BLDG AND DESIGN REPAIRS.MONITOR BLDG FOR MOVEMENT.FILE FOR REPAIRS BY 6/9/22 |
| May 9, 2022 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | AT TIME OF ISNPECTION OBSERVED AT CELLAR, RUBBLE FOUNDATION COLLAPSE FLOORS. VERTICAL CRACKS AT EXPOSURE 2 ON 1ST, 2ND & 3RD FLOORS. DAMAGE D SUSTAINED DUE TO CONSTRUCTION @ AT ADJACENT PROPERTY 200 MADISON STR EET |
| May 9, 2022 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | STRUCTURE RENDERED NON-COMPLIANT. AT TIME OF INSPECTION OBSERVED AT CELLAR, RUBBLE FOUNDATION COLLAPSE, LARGE VERTICAL CRACKS AT EXPOSURE 2, ON 1ST, 2ND, 3RD FLOORS. DAMAGE SUSTAINED DUE TO CONSTRUCTION AT ADJACENT PROPERTY 200 MADISON ST |
| May 9, 2022 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | EMERGENCY WORK: ADJ CONSTRUCTION SITE AT 200 MADISON ST DAMAGED EXP2 (EAST)RUBBLE MASONRY PARTY WALL IN CELLAR. APPROX 15FTLENGTH OF EXP2 PARTY WALL IN CELLAR COLLAPSED AT FRONT END IMMED INSTALL TEMP SHORING ALONG EXP2 ON ALL LEVELS. ALL WORK TO BE DIRECTLY SUPERVISED AND DIRECTED BY NYSPE |