Brooklyn Williamsburg
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
5 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Feb 3, 2021 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | EMERGENCY WORK ORDER:1ST FLOOR WOOD FLOORING WAS HEAVILY DETERIORATED APPROX 2'WIDTH ALNG EXP3 WALL.WOOD FLOORING WAS SAGGING,CRACKED&UNSAFE TO WALK ON.OWNR ENGAGE NYSPE&LIC CONTR TO TMP SHORE BELOW COMPR 1FL AS REQ.WRK TO STRT BY 2/5/21.ALL WRK UNDER FULLTIME SUPV PE.FILE JOB W/IN 2 DAYS FRM STRT WRK.DALY RPTS TO FEU.PERM RPRS PERFM SEPARTE UNDR PRMT |
| Feb 3, 2021 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FTM BLDG SAFE CONDN:DUE TO ADJ CONST@510 DRIGGS AVE INTER FINS.THR-OUT 1ST-4FL APTS CRCK,@EXP3 WALLS&WINDWS/DOORS.CRACKS@CELLAR SLAB&EXP2 FDN WAL.1FL DCK SEVRE DETER.EXP3 BRK FACDE@1FL DELAM&BULG OUT W/O PRP TIES SUPR STRCT.EXIST TIES CORROD&PRTLY DETCH.OWNR RETN PE EVAL ENTRE BLDG& PREP RPR PLNS.BLDG RPR'D UNDR PRMT,STRT BY 3/22/21&SIGNEDOFF BY 5/7/21 |
| Jul 18, 2019 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | STRUCTURE RENDERED NON-COMPLIANT. AT TIME OF INSPECTION DAMAGE OBSERVED TO HAVE BEEN SUSTAINED TO BUILDINGS CONCRETE SLAB AT CELLAR LEVEL EXPOSURES 2 & 3 WHERE SLAB HAS DROPPED AND SEPARATED APPROX: 2 1/2" CRACKING MAIN WASTE LINE TO BUILDING DUE TO ON GOING CONSTRUCTION AT 187 NORTH 8TH STREET BROOKLYN. |
| Jan 1, 2009 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Jan 6, 2006 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |