Brooklyn Bensonhurst
HPD violations
Housing Maintenance Code violations are filed by tax lot (BBL 3-05555-0013), so they can include other buildings on the same lot.
8 records
| Date | Class | Status | Apartment | Summary |
|---|---|---|---|---|
| Apr 30, 2024 | B | FIRST NO ACCESS TO RE- INSPECT VIOLATION | 2 | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX 8 SQ.FT AT CEILING IN THE 3rd ROOM FROM EAST LOCATED AT APT 2, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST ORIGINAL VIOLATION 16935895 ISSUED 30-APR-24 HAS BEEN UPGRADED TO CLASS B PER ADMINISTRATIVE CODE §27-2017.3a(3)(a) or (b). |
| Apr 30, 2024 | A | VIOLATION CLOSED | 2 | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX 8 SQ.FT AT CEILING IN THE 3rd ROOM FROM EAST LOCATED AT APT 2, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST |
| Apr 30, 2024 | B | NOV SENT OUT | 2 | § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR AT CEILING IN THE 3rd ROOM FROM EAST LOCATED AT APT 2, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST |
| Apr 30, 2024 | B | NOV SENT OUT | 2 | § 27-2005 ADMIN. CODE: REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT CEILING IN THE BATHROOM LOCATED AT APT 2, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST |
| Apr 30, 2024 | B | NOV SENT OUT | 2 | § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR AT CEILING IN THE BATHROOM LOCATED AT APT 2, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST |
| Mar 7, 2022 | I | INFO NOV SENT OUT | Not available | §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID REGISTRATION STATEMENT IS FILED. |
| Mar 4, 2022 | B | NOV SENT OUT | Not available | § 27-2005 ADMIN. CODE: PROPERLY REPAIR THE BROKEN OR DEFECTIVE LOCKING ASSEMBLY AT ENTRANCE DOOR TO BUILDING AT PUBLIC HALL, 1st STORY |
| Mar 4, 2022 | C | NOV SENT OUT | 2 | § 27-2029 ADMIN. CODE: PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE 3rd ROOM FROM NORTH AT WEST LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH |