Brooklyn Flatbush
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
11 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Mar 28, 2022 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FTM AND WORK WITHOUT PERMITS. BLDG SUFFERED A FIRE ON3/26/2022. LARGE REAR EXTENSION ROOF W/STEEL FRAMING BEHIND 1917,1919AND 1921. BLDG AND LOT INSTALLD WITHOUT PERMITS.NYSPE STRUCT ENG'R TO IMMED EVAL ENTIRETY OF ALL 3 BLDGS ON LOT AND DESIGN REPAIRS AND LEGALIZATION DWGS |
| Mar 28, 2022 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FTM-FIRE ON 3/26/22 AFFECTD ALL 3 BLDG ON LOT.ORGINAL WOODROOF JOIST @ REAR SETBCK SEVRLY CHARRD&NEW STEEL FRAMD ROOF OVER EXISTPOORLY BRACES PRIMETER WALLS.LARGE CRCKS EXP2&3 WALLS OF REAR EXTNSION NYSPE STRUCTURAL ENGNR-IMMED EVALU 3 BLDGS ON LOT&DSIGN RPRS FILE RPRS BY 5/9/22.OBTN PRMT BY 5/23/22.COMPLT BY 8/29/22 |
| Mar 26, 2022 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | PROVIDE ENGINEER REPORT FOR SITED CONDITION TO ERTINSPECTION@BUILDINGS.NYC.GOV OR 718-286-3460 |
| Mar 26, 2022 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | DUE TO FIREFIGHTING OPERATION SMOKE AND WATER DAMAGE TO BUILDING, CMU WALL STEPPING CRACKS. VACATE ENTIRE BUILDING |
| Mar 26, 2022 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | STRUCTRE RENDERED NON COMPLIANT DUE FIRE DAMAGES SUSTAIN DURING FIREFIGHTING OPERATION OBSERVED SMOKE AND WATER DAMAGE THROUGHOUT. VACATE ENTIRE BUILDING- PROVIDE ENGINEERS REPORT TO ERTINSPECTION@BUILDINGS.NYC.GOV, OR 718-286-3460 |
| Mar 26, 2022 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | BUILDING SUSTAIN FIRE DAMAGE TO ROOF, FDNY VENTED ROOF, CHARD RAFTERS AND SHEETING TO HALF THE ROOF. VACATE TO ENTIRE BUILDING. |
| Mar 26, 2022 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | PROVIDE ENGINEER REPORT FOR SITED CONDITION OF REAR CMU WALL AND PROVIDE A REPORT TO ERTINSPECTION@BUILDINGS,NYC.GOV 718-286-3460 |
| Jan 15, 2010 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |
| Jan 15, 2010 | VW-VIOLATION WORK WITHOUT PERMIT - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | WORK WITHOUT A PERMIT; REMEDY; STOP ALL WORK/MAKE SITE SAFE ONLY! OBTAIN ALL NECESSARY PERMIT S FOR WORK AT PREMISES IF FEASIBLE OR RESTORE TO PRIOR LEGAL CONDITION |
| Jan 19, 2007 | VW-VIOLATION WORK WITHOUT PERMIT - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |
| Apr 28, 2001 | VW-VIOLATION WORK WITHOUT PERMIT - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | WORK WITHOUT A PERMIT. WORK NOTED: PARTITION ERECTED IN LEGAL COMMER- CIAL SPACE TO CREATE 2 SEPARATE COMMERCIAL SPACES. NEW STORE FRONT CREATED REMEDY: OBTAIN PERMITS & APPROVALS IF FEASIBLE OR RESTORE PREMISES TO PRIOR LEGAL CONDITION |