Brooklyn Flatbush (West)-Ditmas Park-Parkville
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
4 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Nov 14, 2025 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION |
| Mar 15, 2025 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | AT TIME OF INSPECTION OBSERVED BATHROOM FLOOR AT APT#1R UNEVEN, AT CELLAR LEVEL OBSERVED JOIST BELLOW APT#1R FLOOR ROTTED , SAGGING ,DETERIORATED AND IN DANGER OF COLLAPSE. ACTIVE WATER LEAK. OBSERVED AT CELLAR LEVEL WOODEN SHORING WHICH SUPPORTED FLOOR BELLOW APT 1R BATHROOM FLOOR. |
| Sep 23, 2024 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION |
| Apr 25, 2023 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION |