NYC Building Report

Brooklyn East Flatbush-Erasmus

1851 Nostrand Avenue, Brooklyn

DOB violations

Department of Buildings violations attached to this BIN or tax lot.

22 records

Date Status Type Summary
Nov 14, 2025 V-DOB VIOLATION - ACTIVE HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2024 INTERNAL HGH PRESSURE INSPECTION
Nov 14, 2025 V-DOB VIOLATION - ACTIVE HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL HGH PRESSURE INSPECTION
Aug 28, 2025 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL REQUESTING AN ENGINEER REPORT DUE TO CHIMNEY AND EXTERIOR WALL(EXPOSURE 3) BEING IN A STATE OF DISREPAIR. AN ENGINEERING REPORT IS REQUIRED TO ASSESS AND RECTIFY THE DAMAGES PROPERTY HAS SUSTAINED.
Sep 23, 2024 V-DOB VIOLATION - ACTIVE HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2023 INTERNAL HGH PRESSURE INSPECTION
Sep 23, 2024 V-DOB VIOLATION - ACTIVE HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL HGH PRESSURE INSPECTION
Jun 30, 2023 V-DOB VIOLATION - ACTIVE HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2021 INTERNAL HGH PRESSURE INSPECTION
Jun 30, 2023 V-DOB VIOLATION - ACTIVE HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL HGH PRESSURE INSPECTION
Jun 30, 2023 V-DOB VIOLATION - ACTIVE HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2020 INTERNAL HGH PRESSURE INSPECTION
Jun 30, 2023 V-DOB VIOLATION - ACTIVE HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL HGH PRESSURE INSPECTION
Jun 20, 2023 V-DOB VIOLATION - ACTIVE HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2019 INTERNAL HGH PRESSURE INSPECTION
Jun 20, 2023 V-DOB VIOLATION - ACTIVE HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL HGH PRESSURE INSPECTION
Jun 20, 2023 V-DOB VIOLATION - ACTIVE HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2018 INTERNAL HGH PRESSURE INSPECTION
Jun 20, 2023 V-DOB VIOLATION - ACTIVE HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL HGH PRESSURE INSPECTION
Apr 25, 2023 V-DOB VIOLATION - ACTIVE HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL HIGH PRESSURE INSPECTION
Apr 25, 2023 V-DOB VIOLATION - ACTIVE HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2022 INTERNAL HIGH PRESSURE INSPECTION
Mar 16, 2020 V-DOB VIOLATION - ACTIVE HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED - FAILURE TO FILE 2017 INTERNAL HIGH PRESSURE BOILER INSPECTION
Mar 16, 2020 V-DOB VIOLATION - ACTIVE HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED - FAILURE TO FILE 2017 EXTERNAL HIGH PRESSURE BOILER INSPECTION
Jun 22, 2018 V-DOB VIOLATION - ACTIVE HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED FOR FAILURE TO FILE 2016 ANNUAL HIGH PRESSURE BOILER INSPECTION
Jun 23, 2017 V-DOB VIOLATION - ACTIVE HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED FOR FAILURE TO FILE 2015 ANNUAL HIGH PRESSURE BOILER INSPECTION
May 15, 2014 V*-DOB VIOLATION - DISMISSED HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED FOR FAILURE TO FILE 2012 ANNUAL HIGH PRESSURE BOILER INSPECTION
Dec 3, 2011 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL DOB VIOLATION ISSUED FOR MATTERS NOT PROVIDED. AUTOMIBLE STRUCK INTO THE BUILDING
Aug 9, 1994 V-DOB VIOLATION - ACTIVE ES-ELECTRIC SIGNS NONE ES-ELECTRIC SIGNS NONE