Brooklyn Flatlands
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
3 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Jun 24, 2024 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN-BROKEN WAL@EXP274.VARIOUS CRACKS @DAMAGE.LARGE DIAGONAL CRACK@EXP4 WITH BRICKS OFFSET.BRICKS AT EXP1&4 CORNER BULGED OUTWARD.DISTRESS SIGNS@BLDG FRONT MASONRY DAMAGE.FULL VACATE ENTIRE BLDG.OWNR IMMED RETAIN NYSPE EVAL ENT BLDD PREP RPR DWGS,FILE&RPR UNDR PRMT STRT 7/8/24 COMPL 8/19/24 |
| May 14, 2024 | V-DOB VIOLATION - ACTIVE | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | ERECT APPROXIMATELY 25 LINEAR FEET OF SIDEWALK SHED AT EXPOSURE 1 AND RETURN AT EXPOSURE 2 TO ENCLOSE POTENTIAL FALL ZONE AND PROTECT THE PU BLIC |
| May 13, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | OBSERVED FACADE IN STATE OF DISREPAIR ,EXP#2 WALL HAVE VERTICAL CRACKS AND HOLE, EXP#1 WALL HAVE CRACKS, ENTRY STOOP PARTIALLY COLLAPSE, AT EXP#4 CEMENT DISPLACING FROM WALL AND FALLING ONTO SIDE-YARD AND ADJACENT SIDE YARD, BRICKS BULGING. |