NYC Building Report

Brooklyn Bedford-Stuyvesant (West)

18 Claver Place, Brooklyn

DOB violations

Department of Buildings violations attached to this BIN or tax lot.

2 records

Date Status Type Summary
May 21, 2025 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL EWO OBSRVD 1 STORY BLDG WITH MASONRY BRICK PARAPET WALL WHICH APPEARS TO HAVE SHIFTED & DISPLAYS CRACKING. REMDY: IMMEDITE INSTALL ADEQUATE SAFTY MEAS TO PROTCT THE PUBLC. IMMEDLY RETAIN A NYS PROFESSINL ENGINR TO EVALUATE THE FACDE INCLUDIN PARAPET & PROVIDE METHOD OF STABILIZIN/ REPAIRIN THE STRCTRE. COMPLETE ALL STABILZATIN/REPAIR WORK BY 5/29/25
May 21, 2025 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL EMERGENCY WORK ORDER.AS NOTED AS TIME OF INSPECTION AN OCCUPIED PRKNG GARAGE.OBSRVD 1STRY BLDG W/MASONRY BRCK PARAPET WALL WHICH APPEARS TO HAVE SHIFTD & DISPLAYS CRACKING.IMMED INSTLL ADEQUARE SAFETY MEASURES TO PRTCT PBLC.IMMED RTAIN A NYS PROFSSNL ENGNEER TO EVAL THE FACADE INCLDNG PRPTS