Brooklyn Greenpoint
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
6 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Apr 16, 2026 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | STRUCTURE RENDERED NON-COMPLIANT. AT TIME OF INSPECTION OBSERVED ONGOING EXCAVATION WORK AT 180 EAGLE STREET HAS UNDERMINED EXPOSURE #3 CAUSING STRESS CRACKS THROUGHOUT CELLAR LEVEL, 1ST, 2ND, 3RD FLOOR. |
| Nov 19, 2025 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FTC W/COMMISSIONER'S ORDER#347921 VIO#101425PI30101SB DATED 10/14/25 REQUIRING OWNER TO START BLDG REPAIRS UNDER PERMIT. AS OF 11/19/25 THERE ARE NO JOBS FILED IN BIS ORD DOBNOW TO REPAIR BLDG. IMMED COMPLY W/COMMISSIONER'S ORDER#347921 VIO#101425PI30101SB TO REPAIR THE BLDG UNDER PERMIT |
| Oct 14, 2025 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FTM BLDG IN A CODE COMPLIANT MANNER-OBSVD @ EXP1 DAMAGED CORNICE, DAMAGED/LOOSE FACADE SIDING/HIGNLES AND DETERIORATING WINDOW STONE HEADERS. OWNER TO IMMED RETAIN NYSPE TO EVAL ENTIRE BLDG DETERMINE THE STRUCT STAB & PREPARE/FILE REPAIR DWGS, REPAIR BLDG UNDER PERMIT START WORK BY 11/14/25 COMPLETE/SIGN OFF WORK BY 12/14/2025 |
| Jun 20, 2023 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION |
| Apr 6, 2018 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT |
| May 15, 2014 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT |