Brooklyn Bushwick (West)
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
11 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Nov 10, 2009 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO COMPLY WITH DOB STOP WORK RESCIND ORDER PARTIAL DATED 10-06 -09 WHICH AUTHORIZED SHORING BRACING FOOTINGS AND FOUNDATION WALLS ONL Y EXCEPT AT CONCRETE PAD BEING EXPOSURE 2 BUILDING MAINTAIN BEAM NOTED : THE FOUNDATION WALL IS NON COMPLETED ALL ALONG EXPOSURE 2 INCLUDE AT THE EXCEPTED AREAS REMEDY; STOP ALLWORK PAY FINES PROVIDE APPROVED PL |
| Sep 18, 2009 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | STOP ALL WORK WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND/OR APPROVED AMENDMENTS AT TIME OF INSPECTION EXP #1 RAKERS MISSIN G EXP#4 RAKERS MISSING NO CONTROL FOOTING FOR EACH EXP #4 # REAR OF EX P #2 SHORING NOT AS PER PLANS REMEDY: STOP ALL WORK CONFORM TO APPROVE D DOCUMENTS OR AMENDMENTS CALL 212 442-1544 FOR INSPECTION |
| Jul 28, 2009 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | INADEQUATE DETAILS ON APPROVED PLANS FOR LAYOUT OF STRUCTURAL FLOOR BE AMS, ALL LEVELS, 2. WALL CONSTRUCTION AT STAIRS, BOILER ROOM, ETC. S HOWN AS TYPE 2. FRAME W/ SHEET TRUCK BUT SECTION AT STAIRS SHOW CMU, 3. NO ANCHORAGE REQUIREMENTS FOR CMU WALLS TO FOUNDATIONS REMEDY: AMEND PLANS TO SHOW ALL REQUIRED STRUCTURAL AND FIRE PROTECTI |
| Jan 27, 2009 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | WORK DOES NOT COFORM TO APPROVED CONSTRUCTION DOCUMENTS NOTED: A JOB S ITE WITH SWO IN EFFECT #102108CEX0402DP UNDERPINNING COMPLETED AT EXP3 SHEETING AND SHORING ALONG EXP 2 (REAR) AND EXP 4 DO NOT CONFORM TO A PPROVED PLANS NO DIMENSIONS ELEVATION CONNECTION DETAILS FOR WALER REMEDY: STOP ALL WORK CONFORM TO APPROVED PLANS CALL EXCAVATION UNIT |
| Oct 21, 2008 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO PROVIDE APPROVED PLANS AT TIME OF INSPECTION ACTIVE EXCAVAT ION AT EXP 2, 3 APPROX 9FT AT EXP2 REAR LOT LINE TO LOT LINE APPROX 7- 9FT NON PERFORATED AND XEROX COPYS UNSUBSTANTIAL UNCOMPLETE DRAWINGS O N SITE REMEDY: STOP ALL WORK PROVIDE APPROVED PLANS TO EXCAVATION UNIT |
| Jan 19, 2007 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Jan 6, 2006 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Jan 31, 2005 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Feb 13, 2004 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Mar 19, 2003 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Mar 26, 2002 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |