Brooklyn Crown Heights (North)
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
1 record
| Date | Status | Type | Summary |
|---|---|---|---|
| Mar 28, 2023 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | AT TIME OF INSPECTION OBSERVED. AT EXP#1 FACADE VENEER BRICKS AT SECOND FLOOR DISPLACED AND HAVE SPACE BETWEEN WALL AND VENEER. CONCRETE SLAB AND PORCH HAVE CRACKS AT MULTIPLE LOCATIONS. APT# 3 FLOOR AT LEAVING ROOM BULGING. |