Brooklyn Coney Island-Sea Gate
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
12 records
| Date | Status | Type | Summary |
|---|---|---|---|
| May 15, 2026 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FTC W/COMMISSIONER'S ORDER CONTROL#348074 VIO#031926PI31301HZ DATED 03/19/26 REQUIRING OWNER TO PROVIDE A CORRECTIVE ACTION PLAN BY 04/19/26. AS OF 05/15/26 THE REQ'D CAP WAS NOT REC'D. IMMED COMPLY WITH COMMISSIONER'S ORDER CONTROL#348074 VIO#031926PI31301HZ |
| Mar 19, 2026 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | CORRECTIVE ACTION PLAN REQ'D-OBSVD @ EXP1 FRONT SIDE OF BLG VARIOUS LOCATIONS OF DISREPAIR & RISK OF COLLAPSE. BROKEN BRICKS&DISLODGED STONE PLUS DETERIORATED LINTELS AROUND WINDOWS. MORTAR CRACKS @ LEFT SIDE OF BLDG. OWNER TO IMMED RETAIN REG DESIGN PROF IN GOOD STANDING W/DOB&NYSED TO EVAL ENTIRE BLDG&SUBMIT A CORRECTIVE ACTION PLAN |
| Sep 23, 2024 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION |
| Jun 30, 2023 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION |
| Jun 20, 2023 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION |
| Apr 25, 2023 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION |
| Nov 8, 2019 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT |
| Feb 24, 2017 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT |
| Apr 5, 2007 | VW-VIOLATION WORK WITHOUT PERMIT - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | WORK WITHOUT A PERMIT NOTED:FIRST FLOOR RENOVATION IN PROGRESS WITH DROP CEILING,HIGH HATS,FLUERSCENT LIGHTS,AND PLUMBING LINES RUN FOR BATHROOM AND STOVE FIXTURES,ALSO PARTITIONS ERECTED REMEDY:STOP ALL WORK-OBTAIN PERMITS |
| Jan 6, 2006 | V-DOB VIOLATION - ACTIVE | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Feb 7, 2000 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Aug 16, 1993 | V-DOB VIOLATION - ACTIVE | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |