25 records

Date Status Type Summary
Jun 30, 2023 V-DOB VIOLATION - ACTIVE HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2021 INTERNAL HGH PRESSURE INSPECTION
Jun 30, 2023 V-DOB VIOLATION - ACTIVE HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2021 INTERNAL HGH PRESSURE INSPECTION
Jun 30, 2023 V-DOB VIOLATION - ACTIVE HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2021 INTERNAL HGH PRESSURE INSPECTION
Jun 30, 2023 V-DOB VIOLATION - ACTIVE HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL HGH PRESSURE INSPECTION
Jun 30, 2023 V-DOB VIOLATION - ACTIVE HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL HGH PRESSURE INSPECTION
Jun 30, 2023 V-DOB VIOLATION - ACTIVE HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL HGH PRESSURE INSPECTION
Jun 30, 2023 V-DOB VIOLATION - ACTIVE HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2020 INTERNAL HGH PRESSURE INSPECTION
Jun 30, 2023 V-DOB VIOLATION - ACTIVE HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2020 INTERNAL HGH PRESSURE INSPECTION
Jun 30, 2023 V-DOB VIOLATION - ACTIVE HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2020 INTERNAL HGH PRESSURE INSPECTION
Jun 30, 2023 V-DOB VIOLATION - ACTIVE HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL HGH PRESSURE INSPECTION
Jun 30, 2023 V-DOB VIOLATION - ACTIVE HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL HGH PRESSURE INSPECTION
Jun 30, 2023 V-DOB VIOLATION - ACTIVE HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL HGH PRESSURE INSPECTION
Jun 20, 2023 V-DOB VIOLATION - ACTIVE HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL HGH PRESSURE INSPECTION
Jun 20, 2023 V-DOB VIOLATION - ACTIVE HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL HGH PRESSURE INSPECTION
Jun 20, 2023 V-DOB VIOLATION - ACTIVE HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL HGH PRESSURE INSPECTION
Apr 25, 2023 V-DOB VIOLATION - ACTIVE HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2022 INTERNAL HIGH PRESSURE INSPECTION
Apr 25, 2023 V-DOB VIOLATION - ACTIVE HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2022 INTERNAL HIGH PRESSURE INSPECTION
Apr 25, 2023 V-DOB VIOLATION - ACTIVE HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2022 INTERNAL HIGH PRESSURE INSPECTION
Apr 21, 2022 VPW*-VIOLATION UNSERVED ECB-WORK WITHOUT PERMIT-DISMISSED C-CONSTRUCTION OTHER OPTIONAL PARAPET AND FACADE REPLACEMENT WORK ONGOING WITHOUT A PERMIT
Mar 16, 2020 V*-DOB VIOLATION - DISMISSED HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED - FAILURE TO FILE 2017 INTERNAL HIGH PRESSURE BOILER INSPECTION
Mar 16, 2020 V-DOB VIOLATION - ACTIVE HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED - FAILURE TO FILE 2017 INTERNAL HIGH PRESSURE BOILER INSPECTION
Mar 16, 2020 V-DOB VIOLATION - ACTIVE HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED - FAILURE TO FILE 2017 INTERNAL HIGH PRESSURE BOILER INSPECTION
Feb 16, 2019 V*-DOB VIOLATION - DISMISSED BENCH-FAILURE TO BENCHMARK NONE FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
Mar 12, 2012 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
Sep 8, 1989 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL C-CONSTRUCTION OTHER OPTIONAL