Brooklyn Bedford-Stuyvesant (West)
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
3 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Sep 14, 2022 | V-DOB VIOLATION - ACTIVE | COMPBLD-STRUCTURALLY COMPROMISED BUILDING NONE | FAILURE TO SUBMIT AN ACCEPTABLE INSPECTN RPT FOR STRUCTURALLY COMPROMISED BLDG. |
| May 19, 2021 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN:RESIDENTIAL BUILDING THAT SUSTAINED FIRE DAMAGE ON 05/19/2021.SEVERE DAMAGE NOTED AT 3RD FLOOR INTERIOR FINISHES.MODERATE DAMAGE NOTED AT ROOF FRAMING.ROOF IS OPEN.WATER DAMAGE NOTED AT ALL FLOORS.OWNER TO ENGAGE NYS PE AND CONTRACTOR TO EVALUATE AND REPAIR BUILDING UNDER PERMIT.FILE BY 08/01/2021.START BY 09/01/2021 |
| May 19, 2021 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | STRUCTURE RENDERED NON-COMPLIANT. AT TIME OF INSPECTION, AT 3RD FLOOR FINISHED WALLS REMOVED, ROOF OPEN AND WINDOWS OUT. WATER DAMAGE THROUGHOUT BUILDING. DUE TO FIRE AT 17 PULASKI ST. |