Brooklyn Gravesend (West)
HPD violations
Housing Maintenance Code violations are filed by tax lot (BBL 3-06626-0036), so they can include other buildings on the same lot.
418 records
| Date | Class | Status | Apartment | Summary |
|---|---|---|---|---|
| Aug 7, 2023 | B | NOV SENT OUT | D12 | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT D12, 4th STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION ''1674'', 1st FROM WEST AT NORTH |
| Aug 7, 2023 | B | NOV SENT OUT | D8 | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT D8, 4th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION AT NORTH |
| Aug 7, 2023 | B | NOV SENT OUT | A2 | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT A2, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''1674'', 1st FROM EAST AT SOUTH |
| Aug 7, 2023 | B | NOV SENT OUT | A1 | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT A1, 1st STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION AT SOUTH |
| Aug 7, 2023 | B | NOV SENT OUT | B4 | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT B4, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION AT SOUTH |
| Aug 7, 2023 | B | NOV SENT OUT | B1 | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT B1, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION AT SOUTH |
| Aug 7, 2023 | B | LEAD DOCS SUBMITTED, ACCEPTABLE | C3 | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT C3, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION AT SOUTH |
| Aug 7, 2023 | B | NOV SENT OUT | C1 | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT C1, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION AT SOUTH |
| Aug 7, 2023 | B | NOV SENT OUT | D4 | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT D4, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''1674'', 1st FROM EAST AT SOUTH |
| Aug 7, 2023 | B | NOV SENT OUT | D2 | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT D2, 4th STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION ''1674'', 1st FROM EAST AT SOUTH |
| Apr 24, 2023 | C | NOV SENT OUT | C4 | § 27-2056.4 ADM CODE- CORRECT FAILURE TO NOTIFY OCCUPANTS AND/OR TO INVESTIGATE LEAD-BASED PAINT HAZARDS. |
| Apr 24, 2023 | C | NOV SENT OUT | C4 | § 27-2056.7 ADM CODE: CORRECT FAILURE TO PROVIDE TO THE DEPARTMENT WITHIN 45 DAYS OF DEMAND ALL RECORDS REQUIRED TO BE MAINTAINED BY OWNER PURSUANT TO LOCAL LAW 1 OF 2004 RELATED TO LEAD-BASED PAINT NOTICES, INSPECTIONS AND REMEDIATION/ABATEMENT ACTIVITIES. |
| Mar 28, 2023 | C | VIOLATION DISMISSED | A10 | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT A10, 1st STORY, 1st APARTMENT FROM NORTH AT EAST |
| Mar 27, 2023 | A | VIOLATION DISMISSED | Not available | (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS. |
| Jan 18, 2023 | C | VIOLATION CLOSED | A5 | § 27-2056.7, 27-2056.8, 27-2056.9 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY PERFORMING ACTIVITIES NECESSARY TO ABATE TESTED LEAD-BASED PAINT FROM REQUIRED WINDOW AND/OR DOOR FRICTION SURFACES FOR APARTMENT AND MAKE FLOORS SMOOTH AND CLEANABLE, POSITIVE LEAD-BASED PAINT IN AN APARTMENT WITH A CHILD UNDER SIX LOCATED AT APT A5, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''1'', 1st FROM WEST AT NORTH |
| Jan 18, 2023 | C | DEFECT LETTER ISSUED | A5 | § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st DOOR FRAME FROM SOUTH AT WEST WALL, 1st WINDOW FRAME FROM EAST AT SOUTH WALL IN THE KITCHEN LOCATED AT APT A5, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''1'', 1st FROM WEST AT NORTH |
| Jan 18, 2023 | C | INVALID CERTIFICATION | A5 | § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD-PAINT THAT IS XRF TESTED INCONCLUSIVE FOR LEAD CONTENT AT 0.5MG/CM2 AND IS PRESUMED LEAD PAINT AS SET FORTH IN (28 RCNY §11-07(b)) AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE-USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(b)(2) SOUTH WALL, WEST WALL, 1st WINDOW FRAME FROM NORTH AT EAST WALL, 2nd WINDOW FRAME FROM NORTH AT EAST WALL IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT A5, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''1'', 1st FROM WEST AT NORTH |
| Jan 18, 2023 | C | CERTIFICATION POSTPONMENT DENIED | A5 | § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) EAST WALL IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT A5, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''1'', 1st FROM WEST AT NORTH |
| Jan 18, 2023 | C | INVALID CERTIFICATION | A5 | § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD-PAINT THAT IS XRF TESTED INCONCLUSIVE FOR LEAD CONTENT AT 0.5MG/CM2 AND IS PRESUMED LEAD PAINT AS SET FORTH IN (28 RCNY §11-07(b)) AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE-USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(b)(2) 1st CLOSET FROM SOUTH AT WEST WALL DOOR, 1st CLOSET FROM SOUTH AT WEST WALL DOOR FRAME, 1st DOOR FRAME FROM WEST AT NORTH WALL IN THE PRIVATE HALLWAY LOCATED AT APT A5, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''1'', 1st FROM WEST AT NORTH |
| Jan 18, 2023 | C | CERTIFICATION POSTPONMENT DENIED | A5 | § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) EAST WALL IN THE PRIVATE HALLWAY LOCATED AT APT A5, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''1'', 1st FROM WEST AT NORTH |
| Jan 18, 2023 | C | DEFECT LETTER ISSUED | A5 | § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st DOOR FRAME FROM SOUTH AT WEST WALL IN THE BATHROOM LOCATED AT APT A5, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''1'', 1st FROM WEST AT NORTH |
| Jan 18, 2023 | C | INVALID CERTIFICATION | A5 | § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD-PAINT THAT IS XRF TESTED INCONCLUSIVE FOR LEAD CONTENT AT 0.5MG/CM2 AND IS PRESUMED LEAD PAINT AS SET FORTH IN (28 RCNY §11-07(b)) AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE-USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(b)(2) 1st DOOR FROM WEST AT NORTH WALL, SOUTH WALL, 2nd WINDOW FRAME FROM NORTH AT EAST WALL IN THE 3rd ROOM FROM NORTH LOCATED AT APT A5, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''1'', 1st FROM WEST AT NORTH |
| Jan 18, 2023 | C | CERTIFICATION POSTPONMENT DENIED | A5 | § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st DOOR FRAME FROM WEST AT NORTH WALL, NORTH WALL, EAST WALL, WEST WALL, 1st WINDOW FRAME FROM NORTH AT EAST WALL IN THE 3rd ROOM FROM NORTH LOCATED AT APT A5, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''1'', 1st FROM WEST AT NORTH |
| Jan 18, 2023 | C | INVALID CERTIFICATION | A5 | § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD-PAINT THAT IS XRF TESTED INCONCLUSIVE FOR LEAD CONTENT AT 0.5MG/CM2 AND IS PRESUMED LEAD PAINT AS SET FORTH IN (28 RCNY §11-07(b)) AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE-USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(b)(2) 1st CLOSET FROM SOUTH AT WEST WALL DOOR FRAME, 2nd CLOSET FROM SOUTH AT WEST WALL DOOR FRAME IN THE FOYER LOCATED AT APT A5, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''1'', 1st FROM WEST AT NORTH |
| Jan 18, 2023 | C | CERTIFICATION POSTPONMENT DENIED | A5 | § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st CLOSET FROM SOUTH AT WEST WALL DOOR, 1st DOOR FRAME FROM NORTH AT EAST WALL, NORTH WALL, EAST WALL IN THE FOYER LOCATED AT APT A5, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''1'', 1st FROM WEST AT NORTH |
| Jan 18, 2023 | A | VIOLATION DISMISSED | A5 | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st DOOR FROM SOUTH AT WEST WALL, 1st WINDOW FRAME FROM NORTH AT EAST WALL IN THE BATHROOM LOCATED AT APT A5, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''1'', 1st FROM WEST AT NORTH |
| Jan 18, 2023 | B | NOV SENT OUT | A5 | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK OVER THE CEILING IN THE 3rd ROOM FROM NORTH LOCATED AT APT A5, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''1'', 1st FROM WEST AT NORTH |
| Jan 18, 2023 | B | NOV SENT OUT | A5 | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 3rd ROOM FROM NORTH LOCATED AT APT A5, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''1'', 1st FROM WEST AT NORTH |
| Jan 18, 2023 | A | VIOLATION DISMISSED | A5 | § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st DOOR FROM NORTH AT EAST WALL IN THE FOYER LOCATED AT APT A5, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''1'', 1st FROM WEST AT NORTH |
| Jan 18, 2023 | A | VIOLATION DISMISSED | A5 | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 2nd CLOSET FROM SOUTH AT WEST WALL DOOR IN THE FOYER LOCATED AT APT A5, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''1'', 1st FROM WEST AT NORTH |
| Jan 18, 2023 | C | VIOLATION DISMISSED | A5 | § 27-2043.1 HMC INSTALL THE MISSING OR REPAIR/REPLACE THE DEFECTIVE WINDOW GUARD(S) IN ACCORDANCE WITH THE SPECIFICATIONS OF THE NEW YORK CITY HEALTH CODE SECTION 24 RCNY CHAPTER 12. WG TO INSTALL = 2; WG TO REPLACE = 0; WG TO REPAIR = 0; IN THE ENTIRE APARTMENT LOCATED AT APT A5, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''1'', 1st FROM WEST AT NORTH |
| Jan 18, 2023 | C | VIOLATION DISMISSED | A5 | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT A5, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''1'', 1st FROM WEST AT NORTH |
| Jan 18, 2023 | C | VIOLATION CLOSED | A5 | § 27-2005, 27-2007, 27-2041.1 HMC: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE DUE TO INOPERABLE HINGES AT DOOR IN THE ENTRANCE LOCATED AT APT A5, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''1'', 1st FROM WEST AT NORTH |
| Jan 18, 2023 | B | NOV SENT OUT | A5 | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CAULK AND GROUT AROUND BATHTUB IN THE BATHROOM LOCATED AT APT A5, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''1'', 1st FROM WEST AT NORTH |
| Jan 18, 2023 | B | NOV SENT OUT | A5 | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE PORCELAIN GLAZE AT BATHTUB IN THE BATHROOM LOCATED AT APT A5, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''1'', 1st FROM WEST AT NORTH |
| Jan 9, 2023 | B | CERTIFICATION POSTPONMENT DENIED | D3 | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT D3, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH |
| Jan 9, 2023 | B | CERTIFICATION POSTPONMENT DENIED | C3 | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT C3, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH |
| Jan 9, 2023 | B | CERTIFICATION POSTPONMENT DENIED | C1 | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT C1, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST |
| Jan 9, 2023 | B | CERTIFICATION POSTPONMENT DENIED | B2 | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT B2, 2nd STORY, 2nd APARTMENT FROM NORTH AT EAST |
| Jan 9, 2023 | B | CERTIFICATION POSTPONMENT DENIED | B1 | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT B1, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST |
| Jan 9, 2023 | B | CERTIFICATION POSTPONMENT DENIED | A2 | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT A2, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH |
| Jan 9, 2023 | B | CERTIFICATION POSTPONMENT DENIED | 1A | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 1A, 1st STORY, 1st APARTMENT FROM NORTH AT EAST |
| Jan 9, 2023 | B | CERTIFICATION POSTPONMENT DENIED | D12 | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT D12, 4th STORY, 2nd APARTMENT FROM NORTH AT EAST |
| Jan 9, 2023 | B | CERTIFICATION POSTPONMENT DENIED | D9 | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT D9, 4th STORY, 2nd APARTMENT FROM WEST AT NORTH |
| Jan 9, 2023 | B | CERTIFICATION POSTPONMENT DENIED | C12 | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT C12, 3rd STORY, 2nd APARTMENT FROM NORTH AT EAST |
| Jan 9, 2023 | B | NOV SENT OUT | B10 | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT B10, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTH |
| Jan 9, 2023 | B | CERTIFICATION POSTPONMENT DENIED | A10 | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT A10, 1st STORY, 1st APARTMENT FROM NORTH AT EAST |
| Nov 14, 2022 | C | NOV SENT OUT | Not available | § 27-2056.4 ADM CODE- CORRECT FAILURE TO NOTIFY OCCUPANTS AND/OR TO INVESTIGATE LEAD-BASED PAINT HAZARDS. |
| Nov 14, 2022 | C | NOV SENT OUT | Not available | § 27-2056.4(H) AND 27-2056.17 ADM CODE -CORRECT FAILURE TO PROVIDE TO THE DEPARTMENT WITHIN 45 DAYS OF DEMAND ALL RECORDS REQUIRED TO BE MAINTAINED BY OWNER PURSUANT TO LOCAL LAW 1 OF 2004 RELATED TO LEAD-BASED PAINT NOTICES, INSPECTIONS AND REMEDIATION/ABATEMENT ACTIVITIES. |
| Nov 10, 2022 | I | VIOLATION DISMISSED | Not available | §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID REGISTRATION STATEMENT IS FILED. |