Brooklyn Gravesend (West)
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
9 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Jul 2, 2026 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO COMPLY WITH COMMISSIONER'S ORDER:DOB VIOLATION #060226CFEU31102AK (CONTROL #350663)WHICH REQUIRES OWNER IMMED ENGAGE A NYSPE&ENDRSD CNTRCTR TO SAFE LVL UNDR EMRGNCY WRK.AS OF 7/2/26, PARAPET HAS NOT BEEN DEMO'D&THE HAZARDOOUS CONDITION REMAINS.COMPLY W/ COMMISSIONER'S ORDER:DOB VIOLATION #060226CFEU31102AK(CONTROL#350633) |
| Jun 2, 2026 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN.AT TIME OF INSPCTN,OBSRVD PRTL CLLPSE OF PARAPET@ EXP1-2 CRNR.PARAPETS ARE LEANING SIGNIFICANTLY,SPALNG,BULGNG, DETERIORATD&SAGGNG LINTELS,WNDW AC UNITS WITHOUT SUPPORT BRACKETS,ETC OWNR TO RTAIN NYS RDP&ENDRSD CNTRCTR TO EVAL THE ENT FACADE&DEVELOP COMPREHENSIVE,FAACDE RPAIR PLANS.FILE FOR PRMTS |
| Jun 2, 2026 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | EMERGENCY WORK ORDER.AT TIME OF INSPCTN,OSBRVD PARTIAL CLLPSE OF PARAPET OF EXP1-3 CRNR.PARAPTS LEANING SIGNIFICNTLY,PRTICULARLY ALNG THE EXP1 SIDE.FACDE W/WNDW AC U NITS W/O SUPPRT BRACKETS, ETC.OWNR TO ENGAGE CNTRCTR&ENG TO IMMED INNSTLL A SDWLK SHED ALNG W.6TH ST & QUENTIN RD FOR THE FULL BLDG WIDTH&DEPTH.FILE PRMTS |
| Jun 2, 2026 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | EMERGENCY WORK ORDER.AT TIME OF INSPCTN,OBSRVD PRTL CLLPS OF PARAPT@ EXP1-2 CRNR.PARAPTS LEANING INCLDNG CRCKS,SPALLNY,BULGNG,DETERIORATED& SAGGNF LINTLS,WINDW AC UNITS W/O SUPPRT BRACKETS,ETC.OWNR TO IMMED ENGAGE NYSPE&ENDRSD CNTRCTR TO IMMED DEMO EXP1 PARAPT DOWN TO SAFE LVL ENG TO SBMT WRTTN MEANS&METHDS |
| Jun 2, 2026 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FTM BLDG IN A CODE COMPLIANT MANNER-PARAPET PARTIALLY COLLAPSED AT EXP1/2 CORNER AND REMAINING PARAPET AT EXP1 IS LEANING INWARD. AN ANNUAL PARAPET OBSERVATION REPORT IS REQ'D TO BE COMPLETED ANNUALLY STARTING IN 2024. SUBMIT ANNUAL PARAPET OBSERVATION REPORT FOR 2025 TO BE REC'D BY DOB NO LATER THAN 6/16/26 |
| Jun 2, 2026 | V*-DOB VIOLATION - DISMISSED | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | INSTALL APPROXIMATELY 120 LINEAR FT OF SWS AS FOLLOS, 80' LINEAR FT OF SIDEWALK SHED AT LEFT SIDE OF BUILDING EXPOSURE #1(WEST 6 ST)RETURNING AT EXPOSURE #2(QUENTIN ROAD) AND INSTALLING APPROXIMATELY 40' OF SIDE WALK SHED AT EXP#2 TO SAFEGUARD BUILDING AND PUBLIC |
| Aug 3, 2020 | V*-DOB VIOLATION - DISMISSED | BENCH-FAILURE TO BENCHMARK NONE | FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 |
| May 3, 2020 | V*-DOB VIOLATION - DISMISSED | BENCH-FAILURE TO BENCHMARK NONE | FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 |
| Jul 30, 1998 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | HAZARDOUS |