Brooklyn Crown Heights (North)
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
4 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Apr 8, 2024 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | AC 28-105.4.1:EMERGNCY WRK/REQ MONITRNG,INSPCTN 4/5/24,OBSVD EXCAVTN ON ALL EXPOSRS,STRUCTRLY COMPRMSD FLR FRAMING,ON EXTERR FAÇADE,AS WELL AS A POTENTIALLY UNDERMINED PARTY FOUNDATION WALL. REMEDY: STOP ALL WORK, COMPLY W CODE: BACKFILL CELLAR TO ORIGINAL GRADE RETAIN NY S PE=MONITRNG PLAN PURSUANT TO BC 3309.16 BY 04/09/24 |
| Apr 5, 2024 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | AC 28-104.7.11,AC 28-116.2.2,AC 28-301.1,2022 BC1817,BC3304,BC3309, SITE VISIT 4/5/24,OBSRVD EXCAVTN ON ALL EXPOSURES&POTENTIALLY UNDRMIND PARTY FOUNDTN WALL, WHICH ARE POTENTIAL HAZARDS 2 PUBLIC&PROP. REMEDY: STOP ALL WRK,RETAIN NYS PE TO PERFORM STRUCTL STABILTY INSPECTN, 1ST INSP BY4/5,1ST RPT BY 4/8,ASSESS PROP,SUBMT RPTS BY 4/26/24,RECMD PROG |
| Apr 5, 2024 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | ATOI I OBSERVED STRUCTURALLY COMPROMISED CONDITION OF THE INTERIOR GIRDER AND EXCAVATION WORK IN THE PROXIMITY OF THE BEARING WALLS |
| Apr 5, 2024 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | ATOI I OBSERVED STRUCTURALLY COMPROMISED CONDITION OF THE INTERIOR GIRDER AND EXCAVATION WORK IN THE PROXIMITY OF THE BEARING WALLS |